BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Littleton, Colorado. Completed plans call for site work for a bridge / tunnel; and water / sewer project.

As of January 9, 2024 this project was awarded to RME Ltd., LLC dba Surface Infrastructure, but the awarded amount is not available. Reference Number 0000335507 Question Acceptance Deadline 12/04/2023 10:00 PM MT Questions are submitted online No All questions must be submitted in writing via e-mail to _bzmiller@jeffco.us (Questions received after this time will not be accepted.) This Statement of Work is for construction of drainage improvements for West Belleview Avenue Over Bergen Ditch Culvert Replacement Project (Jeffco Project 05-70-13-4046) as fully set forth in the bid package. The Work will be performed per the terms and conditions of the Contract. The Bid Package includes the construction plans and specifications for the project. The construction work will include the following: The Contractor shall remove the existing Corrugated Metal Pipe (CMP) beneath Belleview Avenue. The Contractor shall install a Horizontal Elliptical Reinforced Concrete Pipe (HERCP) with head walls, toe walls, junction structures, and manholes. In addition, the Contractor shall perform regrading work, installation of riprap, asphalt patching, erosion control measures, and site restoration described in the project plans and specifications. The Contactor is responsible for all dewatering activities and traffic control measures necessary for the installation of the replacement structure. Buyer Preferences, Guidelines & Requirements General Requirements - Federally Funded - Insurance Required Award Requirements - All or None Award Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % -- The successful Bidder will be required to execute an agreement with Jefferson County in a form which will include all of the terms, conditions, specifications, bid prices, and any approved exceptions to this bid. The County of Jefferson, Colorado, reserves the right to reject any or all bids or portions thereof, to waive any informalities or irregularities in the bids received which are inconsequential or immaterial in nature, and to approve awards in total or in part, whichever, in its judgment best serves the interests of Jefferson County, Colorado

Award

Bridges / Tunnels

$400,000.00

Public - County

Site Work

21

6

18

9

Subscribe For Documents

103 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
96
Active Projects
40
Bidding Soon
996
All Active Projects
421
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 20, 2023

February 12, 2024

img_map_placeholder

W Belleview Ave, Littleton, CO


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.