BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Riverside, California. Contact the soliciting agency for additional information.

Q & A deadline: Nov 29, 2023 1:00:00 PM EST The Superior Court of California, County of Riverside serves the 2.2 million residents of Riverside County through 15 court locations in three geographical regions - Desert, Mid-County and Western. Located in the heart of Southern California, Riverside County encompasses 28 cities, over 7,300 square miles, and ranks among the nation's fastest growing, and the state's most populous, counties. In addition to judges and commissioners, the Court has over 1,100 employees. The Court is seeking proposals for Court-wide Plumbing Services. The Court intends to issue one or more contracts to qualified Contractors to establish a bank or pool of Contractors to provide services for projects on as as-needed basis. PUBLIC WORKS / PREVAILING WAGES: This is a Public Works project and is subject to the Prevailing Wage rules and regulations imposed by the California Labor Code and the California Code of Regulations. To be qualified to bid, all contractors and subcontractors must be properly Contractor Requirements: Contractor(s) shall supply all labor, supervision, materials, tools, equipment, and all effort necessary required to repair, retrofit, or for the replacement of plumbing systems and products used in all Superior Court occupied buildings. Rented and Owned Equipment: Machinery/equipment that will be considered as an additional cost and used indirectly to the plumbing industry for the performance of normal plumbing services, such as, but not limited to: Backhoes, Jackhammers and Concrete cutters These items (and other approved equipment), if rented from a rental contractor, will be allowed the rental charge plus an administrative mark-up cost not to exceed five percent (5%). The Court reserves the right to request original rental agreement documents. If owned, the equipment shall be charged per the bid rate. Emergency Call-Out Work: Emergencies that arise and must be dealt with immediately without the time for project quotes shall require the first ranked contractor to be notified. Emergencies are usually time and materials. The nature of emergency call-outs is unpredictable as far as the extensiveness of the repairs needed. Some may be simple repairs, while others can be major. Once the emergency is completed, and yet requires additional labor for total completion, the Court may provide the opportunity for all the contractors of record to quote the remaining work as a project.

Post-Bid

Municipal

Public - County

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
210
Active Projects
91
Bidding Soon
2,229
All Active Projects
999
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 6, 2023

January 1, 2024

img_map_placeholder

Multiple Locations, Riverside, CA


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.