BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 23, 2024 at 7:00 PM

Updated January 29, 2024

Renovation of a mixed-use development in Cheyenne, Wyoming. Completed plans call for the renovation of a educational facility.

Site Directions: Baggs Elementary School 3705 Cheyenne Street Cheyenne Wy 82001 Rossman Elementary School 916 West College Drive Cheyenne Wy 82001 Sunrise Elementary School 5021 East 13th Street Cheyenne Wy 82001 Baggs Elementary School Remove All Existing Layers of the Pvc Roof System, Insulation, Flashings, and Metal Flashings. Install New Fully Adhered Black Epdm Roof System With New Insulation, Tapered Insulation Crickets, Saddles and Coverboard. Remove All Hvac Units From Curbs, Flash Curbs Up and Over the Top, Raise Curbs as Needed and Reinstall Hvac Units. When Raising Curbs Extend All Electrical, Control Wiring, Plumbing, and Duct Work as Needed. See Plans for Complete Scope of Work. Rossman Elementary School Remove All Existing Layers of the Pvc Roof System, Insulation, Flashings, and Metal Flashings. Install New Fully Adhered Black Epdm Roof System With New Insulation, Tapered Insulation Crickets, Saddles and Coverboard. Remove All Hvac Units From Curbs, Flash Curbs Up and Over the Top, Raise Curbs as Needed and Reinstall Hvac Units. When Raising Curbs Extend All Electrical, Control Wiring, Plumbing, and Duct Work as Needed. See Plans for Complete Scope of Work. Sunrise Elementary School Remove All Existing Layers of the Pvc Roof System, Insulation, Flashings, and Metal Flashings. Install New Fully Adhered Black Epdm Roof System With New Insulation, Tapered Insulation Crickets, Saddles and Coverboard. Remove All Hvac Units From Curbs, Flash Curbs Up and Over the Top, Raise Curbs as Needed and Reinstall Hvac Units. When Raising Curbs Extend All Electrical, Control Wiring, Plumbing, and Duct Work as Needed. See Plans for Complete Scope of Work. Bid Result Package 1 FRONT RANGE ROOFING SYSTEMS-$905,000 Package 2 BIG HORN ROOFING-$817,445 Package 3 SUPERIOR ROOFING-$944,260

Award

Educational

$3,610,965.00

Public - County

Renovation

14

18

8

4

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
31
Active Projects
5
Bidding Soon
369
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 9, 2024

June 3, 2024

Project location map

Multiple Locations, Cheyenne, WY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.