BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 27, 2025 at 8:00 PM

Updated March 28, 2025

Site work and paving for a road / highway in Cheyenne, Wyoming. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

The project is located along 18th Street and extends from House Avenue west to Snyder Avenue, or potentially Crow Creek, as vetted through the storm sewer design. The 18th Street Reconstruction project is comprised of roadway design, storm sewer design, sanitary sewer design, and water transmission system design. The project will include the design of a storm sewer interceptor mainline and inlets along 18th Street. The outfall may be done via a tie-in with the existing 19th Street 60" steel reinforced polyethylene (SRPE) interceptor pipe and/or extend to Crow Creek under 18th Street. This will require determining if the 19th storm main has sufficient capacity to take on storm water from the proposed 18th Street system. Included in the hydrologic and hydraulic analysis of this portion of the Capitol Basin will be the evaluation of additional storm infrastructure that has been constructed within the last decade. These systems include the 26th Street Interceptor, Civic Commons storm system and detention pond, and the 19th Street Interceptor. This project also includes the replacement of the existing water main from Snyder Ave to House Ave including a new casing under the ReedAve railroad tracks. The new water main will be relocated to the typical ROW alignment where possible and eliminate parallel mains. The replacement will include all branch water mains, fire hydrant leads, fire hydrants, and water service lines within the ROW. This project also includes the replacement of the existing manholes and lampholes in the ROW Any and all Proposers may make inquiries in writing to City at any time prior to 5:00 pm on Thursday, March 20, 2025

Conceptual

Roads / Highways

$1,000,000.00

Public - City

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Special Procedures, Alteration Project Procedures, Execution and Closeout Requirements, Execution
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Excavation

Find More Local Projects

Within 75 Miles of This Project
77
Active Projects
35
Bidding Soon
530
All Active Projects
210
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 18, 2026

img_map_placeholder

E 18th St, Cheyenne, WY

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.