Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and addition to a playground / park / athletic field in Norman, Oklahoma. Conceptual plans call for the addition of a playground / park / athletic field; and for site work for a playground / park / athletic field.
Since the addition of the new 2-court indoor facility was completed as part of the NORMAN FORWARD program, there has been an Increase In year-round activity at the Westwood Tennis Facility. Also, there has been an Increase In participation In Pickleball, which Is a modified version of tennis played on the same courts, just in a smaller area around the net. Due to the increased activity, the court surfaces must be kept playable, which requires regular re-surfacing by qualified tennis court. construction contractors. This is the only way to keep us qualified to host US Tennis Association (USTA) events. We have started a project to re-surface all of the outdoor courts over the current and the next fiscal years. We also need to replace the old incandescent court light fixtures on the oldest courts (courts 8&9) with modem LED box fixtures, add walkways to connect the pro shop to the courts west of the building, add a drinking fountain and paint the inside of the pro shop, replace the toilets in the building and improve the site furnishings and drainage around the facility. The final phase of work. would be to construct either 4 outdoor pickleball courts east of the tennis courts or to build an indoor pickleball facility in that space-both of which would increase the year-round usage of the facility. As of November 21, 2023, this project is included in the city’s 2024-2028 Capital Improvement Program (CIP). Funded for FY2024-2025. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Playgrounds / Parks / Athletic Fields
$400,000.00
Public - City
Addition, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 3, 2024
2420 Westport Dr, Norman, OK
Related To This Project
Norman, OK
Bid Date: Dec 14 2023
Norman, OK
Bid Date: Dec 15 2023
Norman, OK
Bid Date: Mar 07 2024
Norman, OK
Bid Date: Nov 27 2023
Norman, OK
Bid Date: Dec 06 2023
Norman, OK
Bid Date: Dec 07 2023
Norman, OK
Bid Date: Dec 01 2023
Norman, OK
Bid Date: Mar 21 2024
Norman, OK
Bid Date: Nov 16 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.