BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 23, 2025 at 8:00 PM

Updated October 11, 2025

Site work and new construction of a fire / police facility in Port Charlotte, Florida. Working plans call for the construction of a fire / police facility; and for site work for a fire / police facility.

As of April 23, 2025, an architect and a construction manager at risk has been selected. Design is underway and this project is in the pre-construction negotiated status. It is anticipated sub-bidding will commence in July 2025, with construction starting in October 2025. *The closed solicitation has been included below for reference: A. The building delivery method is Construction Manager (CM) at Risk. B. Fire Station 3 is located at 4322 El Jobean Road, Port Charlotte and is to be replaced within the geographical response time. Design shall be in accordance with the County fire station prototype design standards, and also support property evaluation and selection. C. Fire Station 6 is located at 27589 Disston Avenue, Punta Gorda and is to be replaced within the geographical response time. Design shall be in accordance with the County fire station prototype design standards, and also support property evaluation and selection. D. Fire Station 17 shall be built around the Tuckers Grade Boulevard and Tamiami Trail area, based on geographical response time. Design shall be in accordance with the County fire station prototype design standards, and also support property evaluation and selection. Charlotte County is requesting proposals from qualified Contractors to provide professional Construction Manager at Risk services as part of a construction team, which includes design consultants and the County for Fire Stations 3, 6, and 17. There will not be a Pre-Submittal Conference for this project. Please send all questions to the email address below Any questions can be answered by contacting Alisa L. True, CPPB, Senior Contract Specialist at 941.743.1549, or email: Alisa.True@CharlotteCountyFL.gov The total budget for each Fire Station is listed below. Fire Station #3 - $4,200,000. (Design Portion is $200,000) (Pre-Construction & Construction portion $4,000,000) Fire Station #6 - $4,200,000. (Design Portion is $200,000) (Pre-Construction & Construction portion $4,000,000) Fire Station #17 - $5,200,000. (Design Portion is $200,000) (Pre-Construction & Construction Portion $5,000,000) Total - $13,600,000

Pre-Construction/Negotiated

Fire / Police

$15,000,000.00

Public - County

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
270
Active Projects
131
Bidding Soon
1,594
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 13, 2023

October 1, 2025

Project location map

Multiple Locations, Port Charlotte, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.