Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Barrington, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
Barrington Community Unit School District 220 Barrington Middle School - Prairie Campus IL Route 68 (Dundee Road) Off-Site Roadway Improvements Barrington, Illinois 3.PREQUALIFICATION OF BIDDERS: All bidders will submit along with their respective bid documents, a resume of similar projects performed, enumerated as to location, type of work, approximate completion date, and project engineering firm. Additionally, all bidders will submit a list of equipment owned by, or available to them, for the efficient pursuance of the project. Note: Work in the Right-of-Way (ROW) will require Contractor to be pre-qualified and provide a bond to the Illinois Department of Transportation (IDOT). 5.WAGES OF EMPLOYEES: Not less than the prevailing rate of wages as found by the Department of Labor or determined by a court on review shall be paid to all laborers, workers and mechanics performing work under this contract. Certified payroll documentation of general contractor's and all sub-contractors' laborers will be required. 6.REJECTION OF BIDS: The Owner reserves the right to reject any and all bids and bidders and to waive technicalities. 8.DESCRIPTION OF WORK: Project will include but not limited to: hot-mix asphalt surface and binder courses, HMA pavement patching, PCC sidewalk removal and replacement, PCC concrete curb removal and replacement, landscape restoration, storm sewer improvements, pavement markings, other items needed to complete the proposed improvements within the School Property and IDOT ROW. This project is to be bid as a lump sum contract with supplemental unit prices. 9.BID SECURITY: Bid security in the form of a Bid Bond or Certified Check for ten percent (10%) of the base bid made payable to the Barrington Community Unit School District 220 shall accompany the bid. 11.CONSTRUCTION SCHEDULE: The Contractor shall begin the work to be performed under the contract after Monday, June 3, 2024. The Contractor shall be substantially complete by Friday, August 2, 2024 and final completion by Friday, August 9, 2024. Substantial Completion is defined as all improvements except restoration. Final completion is defined as restoration and punch list items. In case of failure to complete the work on time, liquidated damages shall be assessed in accordance with Article 108.09 of the Standard Specifications or other applicable BDE Special Provisions shall apply. Note: a second/third site contractors may be present at these sites; Barrington Middle School - Prairie Campus and Early Learning Center during the Summer completing other construction work.
Award
Roads / Highways
$300,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 8, 2023
June 3, 2024
IL-68, Barrington, IL
Related To This Project
Barrington, IL
Bid Date: Nov 24 2023
Barrington, IL
--
Barrington, IL
Bid Date: Jan 09 2024
Barrington, IL
--
Barrington, IL
Bid Date: Mar 23 2021
Barrington, IL
Bid Date: Mar 28 2024
Barrington, IL
Bid Date: Mar 12 2024
Barrington, IL
Bid Date: Nov 22 2023
Barrington, IL
Bid Date: Nov 29 2023
Barrington, IL
Bid Date: Nov 08 2023
Barrington, IL
Bid Date: Nov 08 2023
Barrington, IL
Bid Date: Oct 07 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.