BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 28, 2023 at 7:00 PM

Updated January 29, 2024

Site work for a road / highway in Spokane, Washington. Completed plans call for site work for a road / highway.

Involves removing wire fence, installing maintenance access pads, permanent signing, ITS systems including CCTV poles, foundations and cabinets, conduit, junction boxes, conductors, VMS sign, wire fence and age, erosion control, traffic control and other work. Involves 22 items and 25 working days. Work class 41. County Spokane County Estimated value $250,000 - $300,000 This is a state funded project. Contact Jody Qualley Project Engineer WSDOTERQualleyBidQuestions@wsdot.wa.gov 509-324-6231 WADOT - I-90, Freeway Arterial Integrated Corridor Management 2021-2023 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Roads / Highways

$238,377.00

Public - State/Provincial

Site Work

21

6

5

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
10
Active Projects
1
Bidding Soon
175
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 6, 2023

January 5, 2024

Project location map

I-90, Spokane, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.