BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 15, 2025 at 7:00 PM

Updated January 16, 2025

Site work and renovation of a mixed-use development in Sheridan, Wyoming. Design plans call for the renovation of a medical facility; and for site work for a water / sewer project.

Department of Veterans Affairs (VA) Manuals and VA publications (Master Construction Specifications, Construction Standards and VA Information Security Handbook 6500.6 etc.). Detail Specific project Elements to be address (complete list shall be a part of AE investigations): water liner at ponds for water treatment plant. Liner may be welded or sprayed as determined by the A/E and shall be designed to withstand the operations and environment of the Sheridan VA water treatment plant. All associated repairs and stability of existing ponds for liner installation. Designs for installation mud drain valves for ponds in or around vault. Design and install catwalk for the ponds to facilitate operations. Design and install Effluent Pipe with three (3) levels to facilitate testing and operational requirements for water quality in ponds as agreed upon by VA staff. New Installation of Transformers for building 58 and water tower for future expansion. Installation of all Mechanical, Electrical, HVAC, Communications requirements for new building and upgrades. Design and install complete raw water meter and associated upgrade components at building 58. Design and install complete Potable water meter and associated upgrade components at building 58. Design and install flow meters with air vacuums as required. Design and install potable and coagulation flow meters and associated upgrades as required. Design for corrections to the leaking vault to the right inside the entrance gate where the water from the clear well flows thru and then down to the water tower. Demo and new construction of building 107 per design requirements for new vault. Design and install valves and associated components for building 107. Design and replace level and temp meter, piping in utility pit and replace transducer. All associated grading, drainage and site work for all improvements. All associated permitting, certifications, and regulatory documentation. Any other identified upgrade and correction components to the system within budget parameters. To be provided by the VA to the designer: one-line prints of as-build utilities and building floor are at the VA Office in AutoCAD or PDF format. The accuracy of these prints is a close approximation of what exists on site. There may be instances where the prints are wrong, therefore the contractor shall be responsible for field verification of all project requirements and measurements. As of January 15, 2025, design is undereway. A tentative bid schedule for contractors has not been established. Further details regarding firm construction and completion timelines have not been determined.

Design

Medical

$8,000,000.00

Public - Federal

Renovation, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
18
Active Projects
9
Bidding Soon
159
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 7, 2025

Project location map

1898 Fort Rd, Sheridan, WY

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.