BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Castle Pines, Colorado. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; water / sewer project; and sidewalk / parking lot.

**As of February 15,2024, this project has been awarded to Elite Surface Infrastructure. A timeline for the project to be started has not been established yet.** Reference Number 0000335973 Job Location: Castle Pines, CO Road Name: Monarch Blvd. Length: 1 Mile Piggyback Contract No Question Deadline 12/01/2023 at 3:00 PM MT Questions are submitted online No Questions shall be submitted in writing via email to jason.rowe@castlepinesco.gov, abha.dwivedy@casttlepinesco.gov and molly.thiebaut@ulteig.com The completion date for the Roadway Reconstruction (asphalt and/or concrete pavement reconstruction) elements of the work will be substantial complete by September 30, 2024 The work performed under this contract generally consists of a full-depth reconstruction and widening of Monarch Boulevard from Castle Pines Parkway to just south of Glen Oaks Avenue. Work includes asphalt pavement and subsurface treatment, curb replacement, sidewalk replacement, drainage improvements, waterline improvements, temporary and permanent pavement markings, traffic control measures, erosion control, utility coordination and support, material testing services, removal of excess materials, and project clean-up, as necessary. Buyer Preferences, Guidelines & Requirements General Requirements - Bid Deposit Required - Certification/Training - Contractors License Required - Installation Required - Insurance Required - Irrevocable Letter of Credit - License Required - Local Service Required - Material Safety Data Sheets Required - Onsite Maintenance Required - Safety Standards Plan - Spill Containment Plan - Warranty Information Required Bonding Requirements - Bid Bond 10 % - Performance Bond 100 % - Maintenance Bond 100 % - Surety Bond 100 % - Labor and Materials Bond 100 % - Payment Bond 100 % The City reserves the right to waive informalities or irregularities and to reject any or all Bids. Capitalized terms have the meaning assigned in the General Conditions.

Award

Roads / Highways

$5,600,441.00

Public - City

Paving, Site Work

85

14

115

7

Subscribe For Documents

177 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
88
Active Projects
34
Bidding Soon
940
All Active Projects
392
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 21, 2023

February 12, 2024

img_map_placeholder

Monarch Blvd, Castle Pines, CO

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.