Site work and paving for a mixed-use development in Holliston, Massachusetts. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Question Deadline 12/14/2023 at 4:00 PM ET Any prospective contractor (bidder) requesting an interpretation of existing specifications of terms and conditions must do so in writing by, addressed to Robert Walker at the Holliston Highway Department, 63 Arch Street, Holliston, MA 01746 or via email to Robert Walker at: walkerr@holliston.k12.ma.us Complete Streets Project consisting of detector panel installation, bituminous sidewalk, raised and flush cement concrete sidewalks, cement concrete wheelchair ramp construction, bituminous curb transitions, granite curbing and transitions, loam and seeding, pavement markings, new traffic signs, clearing and grubbing, removing signage, new speed feedback display signs, new rectangular rapid flashing beacon (RRFB) signs, and other incidentals. Location of Work: The work will be at various locations on Central Street throughout the Town of Holliston. Specific locations will be designated by the engineer. The engineer on these items will be the Deputy DPW Director or his designated representative. Control of Work: The engineer will direct the contractor to the work areas and will designate which sections of streets are to be repaired. Any work performed without the express direction of the engineer will not be measured for payment. Scheduling of Work: Upon award, the successful bidder will provide the Town and its engineer with an anticipated schedule of work. The successful bidder will meet with the engineer to review the areas included in this project. A mutually acceptable work day schedule will be established to attempt to assure that the contractor will have a full day's work each working day requested by the Town. The contractor will respond to work within two weeks of verbal notice. Time Schedule: Work under this proposal will be performed between April 15, 2024 and June 15, 2024 unless otherwise agreed upon in writing

Bid Results

Sidewalks / Parking Lot

$493,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
329
Active Projects
168
Bidding Soon
3,082
All Active Projects
1,293
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 21, 2023

April 15, 2024

img_map_placeholder

Multiple Locations, Holliston, MA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.