Site work for a municipal facility in Aspen, Colorado. Completed plans call for site work for a municipal facility.

Reference Number 0000335955 Job Location: Aspen, Colorado Question Acceptance Deadline 01/05/2024 12:00 AM MT Questions are submitted online Yes Replacement of City of Aspen Direct Buried Electric Circuit with Cable and Conduit installation Buyer Preferences, Guidelines & Requirements General Requirements - Contractors License Required - Installation Required - Insurance Required - License Required - Warranty Information Required Bonding Requirements - Performance Bond 100 % - Maintenance Bond 100 % - Payment Bond 100 % The City reserves the right to reject any or all Proposals or accept what is, in its judgment, the Proposal which is in the City's best interest. The City further reserves the right, in the best interests of the City, to accept a late submittal or to waive any technical defects or irregularities in any and all Proposals submitted. The project will include but is not limited to: The construction of an electrical cable and conduit system within the City of Aspen. The Project includes all civil and electrical installations to procure and install, conduit, new primary cable, and terminate cable(s) in existing electrical devices. The construction includes the placement of new conduits in highly congested alleyways. The project requires coordination to minimize disruption to customer's utility service, City Electric, and otherwise. The Civil Scope of work for this project is depicted in Appendix A: Plan Drawings: Red Brick Plan Drawings commencing on Sheet 11 on the East side of Monarch Street and ending at "Note 2" on Sheet 12, and Appendix A: Plan Drawings -Paepcke-City Market commencing on Sheet 5 (Proposed 3 Phase Electrical Vault) and ending at Sheet 8 Point 24, and continuing on Sheet 11 (Point 27 and ending on Sheet 12 at the end of the "Wagner Parks Brick." This includes installing new brick and retractable bollards, secondary electrical, and a control system on the North Side of Wagner Park as identified on Civil Plans "Wagner Park Paver Replacement." New Primary Electrical Wire installation needs to be installed from points identified on Red Brick Plan Drawings - Final (2024 Remaining Scope) Sheet 13 "Start Point 119" (120 East Main) to Sheet 11 Point 98 (312 East Hyman) and Points identified on "Plan Drawings -Paepcke-City Market (2024 Scope)" Sheet 4 to Sheet 8 Point 222 and Sheet 11 (point 27) to Sheet 12 T-8 (point 31). All Scopes will be discussed in detail at the Pre-Proposal Meeting Bricks are currently planned to be directly purchased by the city of aspen for contractor installation

Post-Bid

Municipal

$2,000,000.00

Public - City

Site Work

6

16

4

6

Subscribe For Documents

39 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
21
Active Projects
9
Bidding Soon
119
All Active Projects
48
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.