Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Charleston, Illinois. Completed plans call for site work for a educational facility; sidewalk / parking lot; and for paving for a sidewalk / parking lot.
ADA Upgrades - Eastern Illinois University Estimate Less than $100,000 DESCRIPTION: The project is Phase 5 of an ongoing ADA improvements project and involves correcting selected deficiencies with respect to the Americans with Disabilities Act which were identified in the Using Agency's ADA Compliance Survey. The project includes PCC sidewalk, sidewalk removal, seeding, and other appurtenances. Base bid includes Locations 74 & 102 as shown in the plan set. Alternate bid G1 includes Location 100 as shown in the plan set. Alternate bid G2 includes Location 116 as shown in the plan set. B. EXISTING CONDITIONS: Sidewalk not compliant with ADA. C. RELATED WORK 1. WORK BY OTHERS: 2. FUTURE WORK: 3. CONTRACT TIME: Refer to Articles 00 72 10 and 01 32 00 of the Standard Documents for Construction. The contractor shall complete all work through Substantial Completion in accord with the contract within 180 consecutive calendar days from the date of the Authorization to Proceed and shall complete all remaining work in accordance with the contract (Final Acceptance) within 30 consecutive calendar days from the date of Substantial Completion. 4. CONTRACT(S). Construct project under single General contract. All work shown on the bidding documents is the responsibility of the contractor, regardless of the trade or specialty involved.
Post-Bid
Sidewalks / Parking Lot
$100,000.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 23, 2024
February 22, 2024
600 Lincoln Ave, Charleston, IL
Related To This Project
Charleston, IL
Bid Date: Dec 12 2023
Charleston, IL
Bid Date: Feb 27 2024
Charleston, IL
Bid Date: Feb 06 2024
Charleston, IL
Bid Date: Mar 08 2024
Charleston, IL
Bid Date: Mar 12 2024
Charleston, IL
Bid Date: Mar 12 2024
Charleston, IL
--
Charleston, IL
Bid Date: Oct 20 2023
Charleston, IL
Bid Date: Nov 09 2023
Charleston, IL
Bid Date: Apr 29 2022
Charleston, IL
Bid Date: Mar 11 2022
Charleston, IL
Bid Date: Mar 08 2022
Charleston, IL
Bid Date: Dec 16 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.