EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 9, 2024 at 7:00 PM

Updated October 1, 2024

Site work and paving for a mixed-use development in River Forest, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

City/County - River Forest Project Location: Various Streets The Replacement of Curb and Gutter, Sidewalk, Driveways, Hot-mix Asphalt Surface Removal, Drainage Structure Adjustment/replacement, Resurfacing and Other Appurtenant Work. ILDOT - 23-00100-00-RS - The Replacement of Curb and Gutter, Sidewalk, Driveways, Hot-mix Asphalt Surface Removal, Drainage Structure Adjustment/Replacement, Resurfacing Bid Deposit: 10% B. IDOT Certification: YES The bid proposals will be publicly opened and read at that time. Proposals will be considered not only on the basis of cost, but also on past performance, experience and ability to perform the work. No bid shall be withdrawn after the opening of the Proposals without the consent of the President and Board of Trustees of the Village of River Forest for a period of thirty (30) days after the scheduled time of the bid opening. Bidders shall be prequalified by IDOT for: Concrete Construction The Village of River Forest reserves the right in receiving these bids to waive technicalities and reject any or all bids. This project consists of the installation of approximately 5,000 square feet of PCC sidewalk, 175 linear feet of PCC curb/gutter, 75 square yards of driveway apron and other work incidental thereto, where designated by the Director of Public Works. No oral or telephone interpretations of specifications shall be binding upon the Village. All requests for interpretations or clarifications shall be made in writing and received by the Village at least five (5) business days prior to the date set for receipt of Bids or at the pre-bid conference, if offered. The Village shall make all changes or interpretations of the Contract Documents in a written addendum and shall provide an addendum to any Bidder of record. Addenda to the bid documents will be published on the following website Failure of any bidder to obtain any addenda shall not relieve the bidder from all obligations of the bidding documents, including any addenda. Any and all changesto theContract Documents are valid only if they are included by written addendum to all Bidders. Each Bidder, by acknowledging receipt of any addenda, is responsible for the contents of the addenda and any changes to the Bid therein. Failure to acknowledge any addenda may cause the Bid to be rejected. The Village will not assume responsibility for receipt of any addenda. In all cases, it will be the Bidder's responsibility to obtain all addenda issued. Bidders will provide written acknowledgement of receipt of each addendum issued with the bid submission. All questions about the meaning or intent of the Contract Documents shall be submitted in writing to: Village of River Forest Attn. Bill Koclanis Civil Engineering Technician Phone: (708) 714-3550 Email: bkoclanis@vrf.us between the hours of 7:30 a.m. and 4:00 p.m., Monday through Friday. Only questions answered by formal written addenda will be binding. Oral and other interpretations or clarifications are without legal effect.

Award

Sidewalks / Parking Lot

$122,400.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Execution and Closeout Requirements, Execution, Application
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 09 - Finishes

Division 09 - Finishes

Wall Finishes, Stone Facing
Division 10 - Specialties

Division 10 - Specialties

Other Specialties, Flags and Banners, Flags
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Excavation
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Concrete Curbs and Gutters, Planting, Turf and Grasses, Seeding

Find More Local Projects

Within 75 Miles of This Project
235
Active Projects
159
Bidding Soon
2,287
All Active Projects
995
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 18, 2023

May 28, 2024

img_map_placeholder

Multiple Locations, River Forest, IL

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

2024 Curb and Sidewalk Replacement

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.