BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Napa, California. Completed plans call for site work for a water / sewer project.

The work includes rehabilitation of approximately 1,810 LF of 39-inch trunk sewer mains by Cured-In-Place Pipe (CIPP) lining and the rehabilitation of 5 trunk manholes within the project area. Also included in the scope of work as Bid Alternate B is the rehabilitation of approximately 910 LF of 39-inch trunk sewer mains by CIPP lining and the rehabilitation of 3 trunk manholes within the project area. Also included in the scope of work as Bid Alternate A and C is the use of non-styrene, no VOC CIPP resin for the CIPP lining work in the Base Bid and Bid Alternate B, respectively. The estimated cost of construction for the Base Bid is $1,000,000. The estimated cost of construction for Bid Alternate B is $700,000. The successful bidder will have 200 calendar days to substantially complete the project from the Notice to Proceed. Documents. Each bid shall be presented under sealed cover and shall be accompanied by a certified check or bidder's bond, made payable to the Owner, in an amount not less than ten percent (10%) of the bid. The said check or bidder's bond shall be given as a guarantee that the successful bidder will execute the contract in conformity with the form of agreement contained within the contract documents, and will furnish bonds and insurance policies as specified within ten (10) days after notification of the award of the Contract to the successful bidder. The contract documents that the successful bidder must submit within ten (10) days of notification of award include, but are not limited to, a payment bond in an amount of at least 100 percent of the amount payable by the terms of the project contract and that satisfies the requirements of California Civil Code Section 3248, and a performance bond in an amount of at least 100 percent of the amount payable by the terms of the contract, and a maintenance bond in an amount of at least ten (10) percent of the amount payable by terms of the contract. All project bonds must be executed by an admitted surety insurer in accordance with applicable law and acceptable to the Owner. The Owner reserves the sole right to reject any or all bids and to waive any informality in a bid. Questions concerning this project should be submitted in writing via regular mail, email, or fax and directed to: NAME: Michael Fitch 1515 Soscol Ferry Road ADDRESS: Napa, CA 94558 PHONE: (707) 258-6030 FAX: (707) 258-6048 E-MAIL: mfitch@napasan.com

Award

Water / Sewer

$841,070.00

Public - City

Site Work

11

10

4

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
130
Active Projects
50
Bidding Soon
1,787
All Active Projects
771
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 19, 2023

February 19, 2024

img_map_placeholder

Multiple Locations, Napa, CA

Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.