BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 25, 2024 at 8:00 PM

Updated May 21, 2024

Site work and paving for a civil project in Wilmington, North Carolina. Completed plans call for site work for a water / sewer project; road / highway; and for paving for a road / highway.

This project will construct a new North Gate secure, vehicle entrance to the Port of Wilmington. The scope includes all major utility infrastructure, roads, bridges, culverts, parking lots and buildings (badging office, general cargo office, and security building). This project will create a new North Gate for the Port of Wilmington. This entrance will be used for general and break-bulk cargo. The project will include new buildings and associated parking for a new badging office, general cargo operational office and a new security building. The entrance and internal road will connect the North property from Greenfield Street to an existing tie in point to industrial drive. The project will include new electrical, storm, communication, and lighting infrastructure. Solar back up power for operation functionality is included in the project along with EV charging stations. For purposes of coordination, primary contact for project information is: Ken Pearce Sr. Project Manager 2202 Burnett Blvd., Wilmington, NC, 28401Phone Number Ken.pearce@ncports.com 910-746-6470

Post-Bid

Water / Sewer

$26,817,500.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
93
Active Projects
50
Bidding Soon
601
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 20, 2024

September 20, 2024

Project location map

To Be Determined, Wilmington, NC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.