BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 16, 2024 at 7:00 PM

Updated January 29, 2024

Site work and new construction of a bridge / tunnel in St George, Utah. Completed plans call for the construction of a bridge / tunnel; and for site work for a bridge / tunnel.

Virgin River South Trail Bridge. Each sealed envelope containing a BID must be plainly marked on the outside #23-162 and VIRGIN RIVER SOUTH TRAIL BRIDGE The BIDS shall be opened in an electronic meeting. Notice for the BID opening shall be sent to everyone on the Plan Holders List prior to the BID opening. As required by St. George City Code 1-1 0B-14 a signed certificate of legal work status for the BIDDER must accompany the BID. City of St. George reserves the right to reject any, or all BIDS, or to waive any formality or technicality in any BID, in the interest of the city.

Award

Bridges / Tunnels

$81,651.00

Public - City

New Construction, Site Work

3

5

2

5

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
17
Active Projects
7
Bidding Soon
134
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 13, 2023

January 22, 2024

Project location map

I-15, St George, UT


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.