BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Ullin, Illinois. Completed plans call for the renovation of a educational facility.

PROJECT DESCRIPTION: Demolition work to include the removal of several bathrooms, kitchenettes, closets, and wood stud framed walls to merge smaller living units into new classrooms, including all related MEP modification work. New work to include the infill and modification of wood stud framed walls and textured GWB ceilings, new LVT flooring, paint, light fixtures, plumbing fixtures, and door hardware. INFORMATION TO BIDDERS: 1. See Section 00 10 00 Instruction to Bidders and Section 00 10 01-Supplemental Instructions to Bidders bound within the Project Manual for further bidding requirements. 2. The successful bidder shall comply with the provisions of the Illinois Prevailing Wage Act, specifically including the payment of the applicable prevailing wages to all laborers, workers, and mechanics performing work under the contract. 3. Questions to be directed to Architectural: Baysinger Architects, LLC Ronny Metzger - ronny@baysingerarchitects.com 401 North Market St. Marion, IL 62959 Ph: 618.993.8250; Fax: 618.993.8255 Mechanical, Plumbing, Electrical: Strickland Engineering, LLC Mark Strickland-mstrick@stricklandengineering.com 113 West Main Street Jackson, MO 63755 Ph: 573.243.4080; Fax: 573.243.2191 4. The Owner is exempt from sales tax. 5. Payment and Performance Bonds will be required. 6. Bid Bond or Certified Check made payable to the Owner in the amount of 5% of the base bid will be required. 7. Bids shall be awarded to the lowest responsible bidder, considering conformity with specifications, terms of delivery, and quality and serviceability, as determined by the Board. The Owner reserves the right to reject any and all bids in whole or in part or to waive any informality in the bidding process. Any such decision shall be considered final. 8. No bid shall be withdrawn for a period of sixty (60) days subsequent to the opening of bids without the consent of the Owner. 9. Facsimile and electronic bids will not be accepted. Bidders are responsible for ensuring timely delivery of their bids; no late bids will be accepted. Questions During Bidding: All questions must be submitted no later than 10:00 A.M. on Monday, December 11, 2023 to allow for review and possible correction via addendum.

Award

Educational

$437,437.00

Public - City

Renovation

19

20

17

6

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
26
Active Projects
18
Bidding Soon
307
All Active Projects
113
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 11, 2023

January 10, 2024

img_map_placeholder

751 Ullin Ave, Ullin, IL

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.