Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an elderly care / assisted living facility in Canton, Massachusetts. Completed plans call for the renovation of a elderly care / assisted living facility.
Common Hallway Flooring Replacement, Rubin Court Elderly Development 667-2, Julius Rubin Court, Canton, MA 02021 The Project consists of but not limited to: The project consists of the removal and replacement of the existing VCT flooring with new sheet type flooring. The work is estimated to cost $185,337.00. All bidding Requests for Information (RFIs) shall be submitted online by 12/28/2023 at 5:00PM EST for general bids A. The Work under the Contract consists of: 1. All Work either shown on the Drawings or included in the Specifications unless specifically indicated as not to be done. 2. The Project shall consist of, but not limited to: The project consists of the removal and replacement of the existing VCT flooring with new sheet type flooring. 3. The Contractor shall be responsible for providing and paying for a construction administration software application to be used by all participants on the Project at no cost. B. In addition, the Work under the Contract includes: 1. Work outside the Project Site as called for in the Contract Documents and as required for the performance of the Work. 2. The restoration of any items damaged or destroyed by encroaching upon areas outside the Project Site. 3. Providing and restoring, where appropriate, all temporary facilities. C. The Contractor's attention is directed to Article 3.3 of the General Conditions. D. Permits: See Article 3.16.1 of the General Conditions. E. Utility Back Charges: If applicable, see Article 3.16.5 of the General Conditions. F. Police Details: If applicable, see Article 3.16.6 of the General Conditions. G. The site/building and adjacent site/buildings will be occupied during construction unless otherwise noted in the Contract Documents. The Contractor shall take all necessary precautions to ensure the public safety and convenience of the occupants during construction. Whenever work is to be done inside occupied units, the Contractor's superintendent and an Awarding Authority's representative shall conduct a pre-work inspection of each unit to make note of existing conditions in the unit. Special attention should be paid to areas where new work will meet existing conditions. H. The Work must be completed in a continuous uninterrupted operation. The Contractor must use sufficient personnel and adequate equipment to complete all the necessary Work requirements within a minimum period of time.
Bid Results
Elderly Care / Assisted Living
$248,945.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 3, 2024
February 2, 2024
Julius Rubin Ct, Canton, MA
Related To This Project
Canton, MA
Bid Date: Dec 21 2023
Canton, MA
Bid Date: Mar 07 2024
Canton, MA
Bid Date: Feb 22 2024
Canton, MA
Bid Date: Feb 28 2024
Canton, MA
--
Canton, MA
Bid Date: Feb 29 2024
Canton, MA
Bid Date: Feb 29 2024
Canton, MA
Bid Date: Dec 01 2023
Canton, MA
Bid Date: Dec 01 2023
Canton, MA
Bid Date: Dec 06 2023
Canton, MA
--
Canton, MA
--
Canton, MA
--
Canton, MA
Bid Date: Apr 26 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.