Renovation of an educational facility in Saline, Michigan. Completed plans call for the renovation of a educational facility.

Saline Middle School Roofing Work Schedule The contractor will note on their bid form if they will be planning on completing this project over 1 summer or 2 summers. If the project is 2 summers and after August 16, 2024, a roof area/section must be completed including all sheet metal, no temporary tie-in locations will be allowed and all materials, equipment, and other items must be removed from the site. 2024 Start Date: June 10, 2024 2024 Substantial Completion Date: August 16, 2024 2025 Start Date: June 9, 2025 2025 Substantial Completion Date: August 15, 2025 Final Completion/Closeout Date: 45 Days after Substantial Completion Certified check, money order or Bid Bond by an approved surety company must accompany each proposal in an amount not less than 5% of the bid amount. Price proposal shall be good for a period of no less than 60 days from the bid date, unless otherwise noted. Bid Bond can be included with the bid through Buildingconnected.com. Certified check and money order must be received prior to the bid due date and time at 7265 North Ann Arbor Road, Saline, MI 48176. Performance Bond/Payment Bond Within fourteen (14) days after date of issuance of written notice of selection for the award of a contract, which shall be considered as the notice to proceed, the successful bidder shall enter into a contract with the Owner and shall execute and file with the Owner, the following in the amount 100% equal to full contract sum The Performance Bond must insure the faithful performance of all provisions of the contract and satisfactory completion of the specified work, within the time agreed upon. The Payment Bond must insure the payment and protection of claimants supplying labor or materials to the principal contractor or his subcontractors in the prosecution of the work provided for in the contract. The successful contractor's bond company must be listed by the State of Michigan as a licensed carrier and have an excellent or superior rating from AM Best Company Project Meeting Pre-job conference to be scheduled within five (5) days after award, to be determined by Mark Paulus, Owner's Representative at (248) 880-6791. The District reserves the right to accept or reject any or all proposals, to waive irregularities, and to accept a proposal which, in the District's opinion, is in the District's best interest. For questions contact Mark Paulus at lecoleplanners3@gmail.com or (248) 880-6791. ***AS of February 27, 2024*** The board approved the recommendation of Lecole Planners to award the contracts to the below listed contractors. As part of this recommendation, all vendors have included working on behalf of the District to obtain the available rebates for this project. Furnishing of Solar Panels at Both Buildings - Awarded to Ameresco in the amount of $5,694,483.00 Solar Integrated Roof Bid Categories A - Roof Area 1-14 and B Roof Areas 15-22 (Entire Middle School Roof Area) - Awarded to Quality Roofing in the amount of $2342,616.00 Roofing Consultant and Construction Administration for Both Buildings - Awarded to Roofing Technology Associates LTD in the amount of $532,363 Owner's Representative for Construction - Given to Lecole Planners at $327,392.00 Contingency - $1,400,070 (Allowance) In a total of $10,296,469.00

Award

Educational

$2,342,161.00

Public - City

Renovation

4

7

12

2

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
168
Active Projects
109
Bidding Soon
1,528
All Active Projects
644
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 5, 2023

June 10, 2024

img_map_placeholder

7190 N Maple Rd, Saline, MI

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.