BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 29, 2024 at 7:00 PM

Updated October 30, 2025

Site work and paving for a sidewalk / parking lot in Millerton, New York. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The work proposed under this contract is situated in the Village of Millerton, Dutchess County, New York. The work is located along Main Street (US Route 44). This contract consists of sidewalk and curb replacement. Reference Number 0000336449 The construction of the Village of Millerton Sidewalk Replacement Project in the Village of Millerton, New York. The work proposed under this contract is situated in the Village of Millerton, Dutchess County, New York. The work is located along Main Street (US Route 44). This contract consists of sidewalk and curb replacement. Demolition of existing sidewalk and curb and replacement with new concrete sidewalk and curbing, sidewalk ramp, and driveway crossings. Add Alternate Bid 1: Demolition of existing sidewalk and replacement with new concrete sidewalk along Main Street from the Millerton Library to the Salisbury Bank. The Contractor shall enter into a contract within five (5) calendar days from the date of acceptance of this bid and the work shall be substantially complete within 60 calendar days of the date of the Notice to Proceed., all associated improvements and complete restoration from the date of the April 1st , 2024. Each proposal must be accompanied by a certified check in the sum of five percent (5%) of the amount bid, payable to the order of the Village of Millerton, or a bond with sufficient sureties, to be approved by the Mayor, as Chief Financial Officer, in such amount, conditioned that if the proposal is accepted, the bidder will enter into a contract for the same and will provide acceptable security, in the form of cash, certified check or performance bonds, or letters of credit, as set forth in the contract documents, for the faithful performance of the contract, within 15 days from the acceptance of the proposal. *The Village Board reserves the right, in its discretion, to waive technical noncompliance or irregularities that are not material or substantial, and to reject all bids and to rebid the project.

Award

Sidewalks / Parking Lot

$212,325.00

Public - City

Paving, Site Work

12

14

4

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
595
Active Projects
330
Bidding Soon
4,134
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 8, 2024

February 21, 2024

Project location map

Main St, Millerton, NY


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.