BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 3, 2024 at 8:00 PM

Updated October 30, 2025

Site work for a water / sewer project in Millerton, New York. Completed plans call for site work for a water / sewer project.

PROJECT LOCATION: 5933 N Elm Avenue Millerton, NY 12546 The work consists of replacing 14 hydrants within the Village of Millerton. Bids shall be on a unit price basis. A bid security shall be furnished in accordance with the Instructions to Bidders. The successful bidder will also be required to provide performance and payment bond in the amount of 100% of the value of the contract. The time period for holding Bids, is 45 days after opening of Bids, excluding Saturdays, Sundays, and legal holidays. Disadvantaged Business Enterprise (DBE) goals are applicable to the total dollars paid to the construction contract. The goals for this project are a minimum of 20.0 percent M/WBE participation by certified DBEs. The bidder shall submit completed DBE forms with the bid. Section 00800 contains the funding program construction contract requirements for M/WBE participation. Failure to comply with the requirements of this paragraph may be deemed to render a proposal nonresponsive. No waiver of any provision of this section will be granted unless approved by the New York State Environmental Facilities Corporation (EFC). This project is subject to New York State Prevailing Wage Rates. Federal Minimum Wage Rates as determined by the United States Department of Labor under the Davis-Bacon Act also apply to this project. Whichever of the wage rates is higher will apply. It is the responsibility of the Contractor, before Bid opening, to request if necessary, any additional information on Minimum Wage Rates for those trades people who may be employed for the proposed Work under this Contract. This project is funded by a grant from the New York State Environmental Facilities Corporation Water Infrastructure Improvement Act and by a loan from the Drinking Water State Revolving Fund loan program. Section 00800 contains the funding program construction contract requirements, all of which shall be applicable to this Contract. The project is subject to the American Iron and Steel (AIS) requirement of Section 436 of Public Law (P.L.) 113-76, Consolidated Appropriations Act, 2014, which requires that all of the iron and steel products used in the project are produced in the United States. Section 00800 contains further information on applicable iron and steel products and compliance. In order to receive consideration, questions must be received by Engineer not later August 2, 2024 All questions about the meaning or intent of the Bidding Documents shall be submitted in writing to the Engineer via the Tighe & Bond website The Work will be substantially completed within 90 days from the date of the Notice to Proceed and completed and ready for final payment in accordance with paragraph 15.06 of the General Conditions within 120 days from the date of the Notice to Proceed

Award

Water / Sewer

$362,415.00

Public - City

Site Work

5

10

10

7

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
595
Active Projects
330
Bidding Soon
4,134
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 14, 2024

September 9, 2024

Project location map

5933 N Elm Ave, Millerton, NY


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.