Published January 20, 2024 at 7:00 PM

Updated October 1, 2024

Demolition, site work, renovation and addition to a transportation facility in Latrobe, Pennsylvania. Completed plans call for the addition of a transportation facility; for the demolition of a transportation facility; for the renovation of a transportation facility; and for site work for a transportation facility.

Consists of improvements to the existing three-story terminal building and the construction of an approximately 30,000 square foot addition. Work includes grading, excavation, concrete, steel, general building construction, electrical, HVAC, and plumbing Addendums and other additional or revised Contract Documents will be available on the website ONLY and it is the Bidder's sole responsibility to check the website for additions or revisions up to the day prior to the due date for Proposals listed above. Addendums and other additional or revised Contract Documents will not be transmitted directly to Bidders or Plan Holders. There are separate contracts for General Construction, Electrical Construction, Plumbing Construction (to include sprinklers/FP), and HVAC Construction per the summary of work in specifications section 011200 MULTIPLE CONTRACT SUMMARY and the bid forms included in Section P- PROPOSAL. Bidders can submit on more than one contract. The Work of Project is defined by the Contract Documents and consists of improvements to the existing threestory terminal building and the construction of an approximately 30,000 square foot addition. Work includes grading, excavation, concrete, steel, general building construction, electrical, HVAC, and plumbing. Questions regarding the technical aspects of the bid drawings and/or the contract documents should be directed to the Project Engineer. The Project Engineer is Scott Kunselman and can be contacted by email or phone at SKunselman@mjinc.com or 727-463-4037. Work shall be commenced within ten (10) days of the date specified in the written notification to proceed and shall be fully and finally completed within 360 Calendar days of the date specified in the written notification to proceed for Phase I, 180 Calendar days for Phase II, and 180 Calendar days for Phase III. An additional 90 Calendar days will be provided for ordering and delivery of equipment and materials prior to granting Notice to Proceed.The Westmoreland County Airport Authority hereby notifies that it will affirmatively ensure compliance with the regulations relative to nondiscrimination in Federally assisted programs of the Department of Transportation, title 49, Code of Federal Regulations, Part 26 (as they may be amended from time to time). Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity 1. The Offeror's or Bidder's attention is called to the "Equal Opportunity Clause" and the "Standard Federal Equal Employment Opportunity Construction Contract Specifications" set forth herein. 2. The goals and timetables for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows: Timetables Goals for minority participation for each trade: 6.3% Goals for female participation in each trade: 6.9% These goals are applicable to all of the Contractor's construction work (whether or not it is Federal or federally assisted) performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, it shall apply the goals established for such geographical area where the work is actually performed. With regard to this second area, the Contractor also is subject to the goals for both its federally involved and nonfederally involved construction. The Contractor's compliance with the Executive Order and the regulations in 41 CFR Part 60-4 shall be based on its implementation of the Equal Opportunity Clause, specific affirmative action obligations required by the specifications set forth in 41 CFR 60-4.3(a) and its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade, and the Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor or from project to project for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, the Executive Order and the regulations in 41 CFR Part 60-4. Compliance with the goals will be measured against the total work hours performed. 3. The Contractor shall provide written notification to the Director of the Office of Federal Contract Compliance Programs (OFCCP) within 10 working days of award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the name, address, and telephone number of the subcontractor; employer identification number of the subcontractor; estimated dollar amount of the subcontract; estimated starting and completion dates of the subcontract; and the geographical area in which the subcontract is to be performed. 4. As used in this notice and in the contract resulting from this solicitation, the "covered area" is Latrobe, Pennsylvania, Westmoreland County. Bid Result - ELECTRICAL TERMINAL - A-1 Electric, Inc - 2000000 PLUMBING TERMINAL - Wheels Mechanical Contracting and supplier, Inc - 550300 GENERAL TERMINAL - Allegheny Construction Group, Inc - 7900000 HVAC TERMINAL - Hranec Sheet Metal, Inc - 1549000

Bid Results

Transportation Terminals

$11,999,300.00

Public - Federal

Addition, Demolition, Renovation, Site Work

154

35

57

8

Subscribe For Documents

76 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Work Restrictions, Access to Site, Price and Payment Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Design Data, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Quality Assurance, Manufacturer Qualifications, Fabricator Qualifications, Manufacturer?s Field Services, Quality Control, Contractor Quality Control, Temporary Facilities and Controls, Temporary Utilities, Temporary Construction, Vehicular Access and Parking, Haul Routes, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Closeout Procedures, Closeout Submittals, Maintenance Data, Bonds, Warranties, Project Record Documents, Spare Parts, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition, Facility Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Joists, Metal Decking, Steel Decking, Cold-Formed Metal Framing, Metal Fabrications, Metal Railings
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Thermal Protection, Vapor Retarders, Roofing and Siding Panels, Metal Roof Panels, Membrane Roofing, Roof and Wall Specialties and Accessories, Roof Accessories, Fire and Smoke Protection, Firestopping, Joint Protection, Preformed Joint Seals, Compression Seals, Expansion Control, Expansion Joint Cover Assemblies
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Wood Doors, Specialty Doors and Frames, Coiling Doors and Grilles, Overhead Coiling Doors, Panel Doors, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents, Louvers, Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Finishes, Acoustic Treatment, Acoustic Wall Coating, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Directories, Signage, Interior Specialties, Compartments and Cubicles, Partitions, Toilet, Bath, and Laundry Accessories, Safety Specialties, Fire Protection Specialties, Fire Extinguishers, Exterior Specialties, Protective Covers
Division 11 - Equipment

Division 11 - Equipment

Foodservice Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments, Casework, Countertops, Furnishings and Accessories, Portable Lamps, Lamps, Bedroom Furnishings, Blankets, Furnishing Accessories, Clocks, Rugs and Mats
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Scaffolding
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Common Work Results for Fire Suppression, Hangers and Supports for Fire-Suppression Piping and Equipment, Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping, Fire-Suppression Sprinkler Systems, Wet-Pipe Sprinkler Systems, Dry-Pipe Sprinkler Systems
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, Meters and Gages for Plumbing Piping, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Identification for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Domestic Water Piping Specialties, Domestic Water Pumps, Facility Sanitary Sewerage, Sanitary Waste and Vent Piping, Sanitary Waste Piping Specialties, Facility Storm Drainage, Rainwater Leaders, Facility Storm Drains, Roof Drains, Plumbing Equipment, Domestic Water Filtration Equipment, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Meters and Gages for HVAC Piping, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, HVAC Insulation, Instrumentation and Control for HVAC, Pneumatic and Electric Control System for HVAC, Sequence of Operations for HVAC Controls, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Hydronic Pumps, Refrigerant Piping, Refrigerant Piping Specialties, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, HVAC Fans, Air Outlets and Inlets, Central Cooling Equipment, Cooling Towers, Field-Erected Cooling Towers, Central HVAC Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Raceway and Boxes for Electrical Systems, Identification for Electrical Systems, Commissioning of Electrical Systems, Instrumentation and Control for Electrical Systems, Network Lighting Controls, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Switchboards and Panelboards, Switchboards, Panelboards, Low-Voltage Distribution Equipment, Electrical Cabinets and Enclosures, Wiring Devices, Low-Voltage Circuit Protective Devices, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Transfer Switches, Automatic Transfer Switches, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting, Interior Lighting, Emergency Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Common Work Results for Communications, Pathways for Communications Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Special Foundations and Load-Bearing Elements, Foundation Anchors, Tunneling and Mining
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Paving Specialties, Planting, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Electrical Utilities, Electrical Utility Transmission and Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation, Transportation Construction and Equipment, Transportation Equipment, Passenger Loading Bridges
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Conveyors, Piece Material Handling Equipment, Lifting Devices, Clamps, Hooks, Mobile Plant Equipment, General Vehicles, Maintenance Vehicles
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Liquid Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
106
Active Projects
62
Bidding Soon
886
All Active Projects
413
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 18, 2024

March 18, 2024

img_map_placeholder

148 Aviation Ln, Latrobe, PA


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Arnold Palmer Regional Airport - Terminal Addition & Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.