BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Las Vegas, Nevada. Completed plans call for the renovation of a educational facility.

Question Deadline 12/21/2023 at 5:00 PM PT Please submit any questions or requests for additional information through the NGEM question tab. Questions Answered and Addendums Due: December 28, 2023, at 5:00 p.m. The summary of work includes a turn-key project to demo existing fan coils and associated piping and ductwork. Installation of VAV units and associated piping and ductwork. Area of work indicated Plans 3.1. GENERAL 3.1.1. CSN will occupy the site during the entire period of construction. 3.1.2. Notify CSN in writing when materials which may cause odors will be used, applied, or mixed nearby or directly to the existing building during normal operating hours. 3.1.3. Cooperate with CSN to minimize conflict, and to facilitate CSN's operations. Schedule the Work to accommodate CSN's needs. 3.1.4. The Contractor shall provide sufficient manpower and equipment during each portion of the Work to meet the various completion deadlines. 3.1.5. Any conflict / discrepancy found between the Scope of Work in the Request for Proposal/Invitation for Bid, purchase order, or contract shall be brought to the attention of CSN. 3.1.6. The Contractor will coordinate all work with CSN's Construction Manager assigned to the project. This will include any coordination efforts with any utility companies, other trades, CSN in-house personnel, etc. 3.1.7. The Contractor shall carefully inspect the site and verify all conditions and dimensions prior to proceeding with any work described herein. The Contractor shall notify CSN's Representative of any discrepancies with these documents prior to beginning any construction. 3.1.8. Written dimensions shall take precedence over scaled dimensions and shall be verified on the job site. Any discrepancies shall be brought to the attention of CSN's Representative prior to the commencement of work. 3.1.9. CSN's Architect/ Engineer shall decide all questions relating to the interpretation of the drawings and the acceptable fulfillment of the contract documents. 3.1.10. The Contractor shall provide finished as-builts upon request. 3.1.11. The Contractor shall assign a project manager for the project to provide CSN with a single point of contact

Post-Bid

Educational

$685,000.00

Public - State/Provincial

Renovation

34

5

2

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
45
Active Projects
21
Bidding Soon
448
All Active Projects
214
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 5, 2024

May 16, 2024

img_map_placeholder

6375 W Charleston Blvd, Las Vegas, NV


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.