BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Birmingham, Michigan. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; water / sewer project; and sidewalk / parking lot.

Reference Number 0000336628 Job : Edgewood Road, between Soutlawn and Lincoln Road Name: Edgewood Road Length: 1550 feet Question Acceptance Deadline 12/14/2023 05:00 PM MT Questions are submitted online No, This information may be emailed to the contact below and confirmed by calling (248) 530-1850: Attention: Mr. Cory Borton, Assistant Director of Engineering, cborton@bhamgov.org The will include installation of new combined sewers, storm sewers, water mains, underdrains, water and sanitary services, pavements, sidewalks, sidewalk ramps and driveway approaches on Edgewood Road between Lincoln Avenue and E. Southlawn Boulevard. Approximate quantities are as follows: 1,109 linear feet of combined sewers, 560 linear feet of storm sewers; 278 linear feet of water mains, 4,875 square yards of new pavement (bid alternates for concrete and asphalt options), 313 square yards of new concrete driveway approaches, 2,685 square feet of new sidewalks, plus other work to make a complete . Buyer Preferences, Guidelines & Requirements General Requirements - Bidder /Preregistration Required - Bid Deposit Required - Insurance Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Maintenance Bond 100 % A certified check or bid bond in the amount of five percent (5%) of the base bid must accompany each bid proposal. The City reserves the right to reject any and all bid proposals, All questions about meaning or intent of Contract Documents shall be submitted to the Engineer in writing. Address written inquiries to: Melissa A. Coatta, P.E. City Engineer City of Birmingham Engineering Department P.O. Box 3001 Birmingham, MI 48012 Phone: 248-530-1850 Fax: 248-530-1290 Email: mcoatta@bhamgov.org Bid Results EDGEWOOD RD. SEWER PAY ITEMS Gibralter Construction Co - $691,020.80 EDGEWOOD RD. WATER MAIN PAY ITEMS F.D.M Contracting, Inc - $ 117,640.00 EDGEWOOD RD. PAVING PAY ITEMS F.D.M Contracting, Inc - $ 367,794.50 EDGEWOOD RD. GENERAL PAY ITEMS Gibralter Construction - $ 127,290.00

Bid Results

Roads / Highways

$1,303,746.00

Public - City

Paving, Site Work

27

7

31

6

Subscribe For Documents

87 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
151
Active Projects
76
Bidding Soon
1,396
All Active Projects
567
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 21, 2023

January 22, 2024

img_map_placeholder

Edgewood Rd, Birmingham, MI

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.