BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Palo Alto, California. Completed plans call for the renovation of a educational facility.

This Project consists of the Installation of Televisions, TV mounts, carts, and Extron Audio Visual systems in existing classrooms for Middle and High Schools. To bid on this Project, the Bidder must possess one or more of the following State of California contractors licenses (s): B, C-7, or C-10. Scope of Work: 5 Secondary School sites: Phase 3 Secondary Sites Installation List Classrooms 13 Total Classrooms Remove and e-waste existing AV equipment including smartboard/projector (not all spaces have existing AV equipment) Install electrical outlet and network drop, as necessary Remove and/or split whiteboards (not all spaces have existing whiteboards) Recommend & provide some equipment (projectors, screens) Classroom AV Systems Palo Alto HS: Room 109: Demo & eWaste old projector Install Upgraded projector and add HDMI. shoot image on existing screen Install (2) Wall-mounted ViewSonic 86" Displays to the left and right of the projector screen Mirror the same image on all screens with a Single HDMI input at the teacher's location. Connect all audio to the existing system. Palo Alto High School Room 902 (Auto shop): Demo & disposal of existing projection screen Install a new pull down projector screen to an existing location. Install an Extron system with (2) wall mounted speakers (connect to existing projector) Fletcher Middle School Room C7 Demo the old projector screen and remove ceiling ceiling-mounted projector. Demo old ST projector Install a new ceiling-mounted projector and motorized screen Install an Extron system with (4) wall mounted speakers. Demo & Ewaste CRT tv Gunn High School Rooms L1, L2, L5, J9, J10, G5, D2: Demo existing projector equipment and screen Install a new projector to the existing location. Install a new screen to the existing location Install an Extron system with (4) wall mounted speakers. Add HDMI input to the teacher's location on the Island in Rooms L1, L2, L5, J9, J10 Gunn High School Library Move the IP clock speaker to the proposed location Demo existing projector equipment and screen Demo (1) Existing Plat Panel Display Install one new 55" ViewSonic display Install a new projector to the existing location. Install a new 12' electronic screen to the existing location Install an Extron vault to the proposed location with (6) wall-mounted speakers to proposed locations. Greene Room B8 Install 55" ViewSonic Viewboard IFP5550 installed on mobile cart Apple TV 4K 3rd Generation on Compulocks Apple TV Security Mount JLS Room 160 Demo existing projector equipment and screen Install a new projector to the existing location. Install a new screen to the existing location Install an Extron system with (4) wall mounted speakers. All questions can be addressed to: Palo Alto Unified School District 25 Churchill Avenue, Building D Palo Alto, CA 94306-1099 Attn: Joe DaSilva or Gillian McAfee Phone: (408) 466-4417 (Gillian) Fax: (650) 327-3588 Email: gillian@fs3h.com *Estimate Value listed Reflects the Combined Estimate for Both the Elementary & Secondary Contracts Question Deadline 12/12/2023 Questions received less than SEVEN (7) calendar days prior to the date for opening bids may not be answered.

Bid Results

Educational

$29,842.00

Public - City

Renovation

14

12

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
124
Active Projects
73
Bidding Soon
1,550
All Active Projects
653
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 19, 2023

January 18, 2024

img_map_placeholder

Multiple Locations, Palo Alto, CA

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.