BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Toronto, Ontario. Contact the soliciting agency for additional information.

Reference Number 0000260734 Question Acceptance Deadline 2023/12/13 03:00:00 PM EST Halton, Peel and York are among the fastest growing Regions in Ontario. As they continue to develop, new transmission infrastructure may be required in the future to meet the growing electricity demand over the long term. Given the continued growth expected in these regions, and acknowledging the existence of sensitive environmental features in the area, it is important to keep a transmission infrastructure option open by identifying and preserving a viable corridor of land for future use today. At the same time, it is recognized that with the future Highway 413 being planned in the Region, there is an opportunity to co-locate a transmission corridor with the highway corridor, consistent with the Provincial Policy Statement related to land use planning and development. While the timing of the need for new transmission may not be certain for many years, it is possible that development work could be recommended for some of the identified corridor as early as 2025. In June 2019, the IESO and the Ministry of Energy, Northern Development and Mines (now, the Ministry of Energy) initiated a joint study to identify an appropriate corridor of land for use by future linear transmission infrastructure, if and when the need arises (the Northwest GTA Transmission Corridor Identification Study, hereafter referred to as the Joint Study). The outcome of the Joint Study will be a recommended corridor of land to preserve for future transmission infrastructure and protect from development for other purposes. It should be noted that this study is separate from, but will continue in parallel with, the Ministry of Transportations (MTO) GTA West Transportation Corridor Route Planning and Environmental Assessment Study (related to the assessment of a potential Highway 413). Term: 2024/03/25 12:00:00 AM EDT - 2025/03/25 12:00:00 AM EDT Option: 2 additional periods of 1 year each Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

Conceptual

Roads / Highways

Public - State/Provincial

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
184
Active Projects
113
Bidding Soon
2,542
All Active Projects
970
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 25, 2024

img_map_placeholder

Multiple Locations, Toronto, ON

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.