BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Georgetown, Colorado. Contact the soliciting agency for additional information.

The Clear Creek Board of County Commissioners is seeking a consultant or team with relevant experience and qualifications in custodial/janitorial services. The purpose of this Request for Proposals is to identify and select a qualified service provider to provide full cleaning and custodial services, including trash removal, in County facilities throughout Clear Creek County If your company has suggested revisions to this schedule, please include it in your response. Confidentiality is imperative in the provision of custodial services. Many of the offices include confidential and proprietary information of a sensitive nature. Applying companies and their employees will be subject to background checks if selected. The service provider shall be required to provide all labor, tools, and equipment required to perform the Services. Notwithstanding the foregoing, the County will furnish the following supplies to be used by the service provider in the course of performing the Services: Can liners for trash cans Paper towel rolls for dispensers Toilet paper rolls for dispensers Liquid soap for soap dispensers Floor cleaner Toiler bowl cleaner Contact Person: Matt Taylor mtaylor@clearcreekcounty.us Miscellaneous: Daily custodial services unless otherwise specified: 1. COMMON AREAS: Refuse containers: o Empty Containers/Replace Liners - All refuse containers shall be completely emptied and a clean, appropriately sized liner installed. If liner is clean and not torn, it does not need to be replaced. o Wipe Clean Containers (1X weekly) - Containers shall be damp wiped clean to remove stains, smudges and dried refuse. o Recycling Containers - Recycling containers for all recyclables are to be emptied into large, area recycling bin. o Area Recycling Bins - Checked to determine level of bin and empty into dumpster if need be. Clean & Disinfect: o Public Counters - Clean and disinfect all public counter space areas. o Handles & Handrails (once a month) - Clean and disinfect door handles and handrails. o Drinking Fountains - Fountains are to be disinfected and free of water spots, stains and smudges. Furniture: o Placement - Furniture, chairs, refuse and recycling containers are to be placed back in their appropriate places. o Damp Wipe - Non-porous furniture shall be damp wiped with disinfectant to remove stains, smudges and dried refuse. Items located on work surface shall not be disturbed. o Vacuum (2X weekly) - Upholstered furniture shall be vacuumed, clean and debris free Windows, Glass & Blinds: o Clean Entry Glass (1X weekly) - Entry glass shall be clean and streak free, inside building to head height (six feet high). Carpet: o Vacuum Carpet (2X weekly) - Carpeted areas of offices, lobbies, hallways, corridors, entrances, entry mats and offices are to be vacuumed dirt free. Furnishings (chairs and wastebaskets, etc.) are to be moved and returned to their original locations after vacuuming. o Vacuum Carpet Stairs (1X monthly) - Carpeted stairwells are to be vacuumed dirt free. Hard Surface Flooring: o Sweep Flooring (1x weekly) - Hard surface flooring shall be swept so as to leave floor in a dirt (dust) free state. o Damp Mop Flooring (1x weekly) - Hard surface floor surfaces shall be damp mopped using a neutral floor cleaner. 2. OFFICE AREAS: Refuse containers: o Empty Containers/Replace Liners - All refuse containers shall be completely emptied and a clean, appropriately sized liner installed. If liner is clean and not torn, it does not need to be replaced. o Wipe Clean Containers (1x weekly) - Containers shall be damp wiped clean to remove stains, smudges and dried refuse. Clean & Disinfect: o Public Counters - Clean and disinfect all public counter space areas. o Handles & Handrails (1X monthly) - Clean and disinfect door handles and handrails. Furniture: o Placement - Furniture, chairs, refuse and recycling containers are to be placed back in their appropriate places. o Damp Wipe - Non-porous furniture shall be damp wiped with disinfectant to remove stains, smudges and dried refuse. Items located on work surface shall not be disturbed. Windows, Glass & Blinds: o Clean Entry Glass (1x weekly) - Entry glass shall be clean and streak free, inside building to head height (six feet high). Carpet: o Vacuum Carpet (2X weekly) - Carpeted areas of offices, lobbies, hallways, corridors, entrances, entry mats and offices are to be vacuumed dirt free. Furnishings (chairs and wastebaskets, etc.) are to be moved and returned to their original locations after vacuuming. o Vacuum Carpet Stairs (1X monthly) - Carpeted stairwells are to be vacuumed dirt free. Hard Surface Flooring: o Sweep Flooring (1x weekly)- Hard surface flooring shall be swept so as to leave floor in a dirt (dust) free state. o Damp Mop Flooring (1x weekly) - Hard surface floor surfaces shall be damp mopped using a neutral floor cleaner. 3. RESTROOMS: Refuse containers: o Empty Containers/Replace Liners - All refuse containers shall be completely emptied and a clean, appropriately sized liner installed. If liner is clean and not torn, it does not need to be replaced. o Wipe Clean Containers - Containers shall be damp wiped clean to remove stains, smudges and dried refuse. Clean & Disinfect: o Handles & Handrails - Clean and disinfect door handles and handrails. o Sinks & Countertops - Surfaces are to be wiped down, disinfected and free of water spots, stains and smudges. Restroom Fixtures: o Restocking Dispensers - Restroom dispensers (paper towel, seat covers, toilet paper, soap, etc.) are to be checked daily (see facility schedule). Dispensers shall be filled as needed. Paper rolls shall only be replaced when totally empty, not when paper partially remaining. o Clean Dispensers, Walls and Partitions - Clean dispensers, walls, and partitions to be free of soap scum, finger prints, dirt and smudges. o Clean and Disinfect Restroom Fixtures - Clean and disinfect all porcelain and stainless-steel sings, faucets, counters, lockers, handles, toilets, flush urinals, and ensure urinal partitions to be free of deposits, stains, soap and odors. o Clean and Disinfect Fixture Exteriors - Fixtures (sinks, faucets, toilets, and urinals) exteriors, undersides, and bases are to be cleaned and disinfected with an appropriate cleaner as to remove any deposits which may occur. o Clean and Polish Chrome and Stainless Steel - Plumbing fixtures are to be cleaned and polished so as to produce a shiny, fingerprint free appearance. Mirrors: o Mirror Cleaning - Mirrors to be cleaned with a glass cleaner to leave glass in a spot free, streak free condition. Hard Surface Flooring: o Sweep Flooring- Hard surface flooring shall be swept so as to leave floor in a dirt (dust) free state. o Damp Mop Flooring - Hard surface floor surfaces shall be damp mopped using a neutral floor cleaner. Again, the cleaning schedule above is flexible. If your company has suggested revisions to this schedule, please include it in your response. Deadline for Submission of Questions :December 11, 2023 Deadline for Responses to Submitted Questions: December 14, 2023 Oral Presentations/Interviews (if necessary) Week of January 8, 2024 Estimated Notice of Intent Award January 18, 2024 Estimated Starting Date February 2024 All communications regarding this project should be directed to: Matt Taylor, Clear Creek County Representative. Please do not contact any other team members, staff or employees of Clear Creek County or other parties involved in this project on matters relating to this Request for Proposals. Responses received after the deadline will NOT be considered and will be returned unopened. All timely and properly prepared Responses will be considered for evaluation. The County reserves the right to reject any and all responses and to waive any informality, technical defects or clerical errors in any reponses as the best interest of the County may require. Selection procedures will be conducted in conformance with all applicable qualifications-based selection requirements Applicants may submit written questions to Matt Taylor, Clear Creek County Representative via email to mtaylor@clearcreekcounty.us. All communications must be in writing (email is acceptable). No verbal communications will be permitted. The County reserves the right to issue addenda to the Request-for-Proposals at any time as a result of questions, change in schedule or other matters. The County also reserves the right to cancel or reissue the Request-for-Proposals.

Post-Bid

Municipal

Public - County

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
100
Active Projects
38
Bidding Soon
1,030
All Active Projects
433
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 10, 2023

February 1, 2024

img_map_placeholder

Multiple Locations, Georgetown, CO


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.