BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work, paving, outdoor lighting and new construction of a mixed-use development in Alturas, California. Completed plans call for site work for a playground / park / athletic field; for outdoor lighting for a playground / park / athletic field; sidewalk / parking lot; for paving for a sidewalk / parking lot; for the construction of a pre-engineered storage facility; and pre-engineered storage facility.

The work, in general, to be done under this contract consists of the removal of an existing turf grass area, concrete sidewalk and slabs, sawcut asphalt pavement, trees, overhead lights, fencing and barbeques. As well as construct a pre-fabricated restroom, arched entry sign, playground structures (4), engineered wood fiber fall material, concrete pavement, decomposed granite surfacing, concrete seat walls, installation of shade structures varying in size (3), install fitness equipment (4), planter areas with trees, shrubs and ground cover, planting of natural turf fields, irrigation system for the site, small drainage system for the site, replacement of existing site amenities, installation of bollard solar lights; all within the confines of the Veterans Memorial and Dorris Park TIME FOR COMPLETION: All work shall be completed within 6 months after the Contractor is given a Notice to Proceed. AWARD ANNOUNCEMENT - December 27th, 2023 ENTER INTO CONTRACT - December 29th, 2023 NOTICE TO PROCEED / WORK TO COMMENCE (Pending weather and negotiation of schedule with County) - January 17th, 2024 PROCUREMENT OF MATERIALS - Winter / Spring SUBSTANTIAL TARGET COMPLETION - June 30, 2024 The undersigned agree that should the work not be completed with the time hereinabove stated from and after the date the Contractor is instructed to proceed by the County an amount equal to $500 per day for each day delay after the expiration of such period shall be deducted from the contract sum. Project Management Team Lilly Toaetolu, Modoc County - Project Manager 530-233-6412 lilliantoaetolu@co.modoc.ca.us Bert Austin, Modoc County - Facilities Supervisor 530-640-0698 robertaustin@co.modoc.ca.us Ryan Reidlinger, MDG - Project Designer 530-899-1616 ryan@meltondg.com Greg Melton, MDG - Project Designer 530-899-1616 greg@meltondg.com Contemporaneous with the execution of the Contract Agreement, and before commencement of any Work required by the Contract Documents, Contractor shall provide County with separate payment and performance bonds, each in a sum at least equal to the Contract Sum. These bonds will be provided on forms acceptable to County by surety companies licensed and permitted to do business in the State of California and are named in the current list of "Surety Companies Acceptable on Federal Bonds" as published in Circular 570 (amended) by the Audit Staff Bureau of Accounts, U.S. Treasury Department. The surety shall have not less than an "A" minimum rating in the current "Best's Key Rating Guide, Property Liabilit Park Renovation at Veterans Memorial and Dorris Park Renovation located at 508 South Main Street, Alturas, California, 96101. The undersigned agree that should the work not be completed with the time hereinabove stated from and after the date the Contractor is instructed to proceed by the County an amount equal to $500 per day for each day delay after the expiration of such period shall be deducted from the contract sum. The work, in general, to be done under this contract consists of installation of concrete pavers, flatwork, curbs, seat walls, railing ang asphalt path all within the confines of the Veterans Memorial and Dorris Park, 508 South Main Street, Alturas, CA 96101 all in conformance with the attached Contract specifications entitled: PROJECT NAME: MODOC COUNTY - Veterans Memorial and Dorris Park Renovation

Bid Results

Playgrounds / Parks / Athletic Fields

$1,504,406.00

Public - County

New Construction, Outdoor Lighting, Paving, Site Work

37

20

2

4

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
3
Active Projects
1
Bidding Soon
17
All Active Projects
7
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 10, 2024

January 22, 2024

img_map_placeholder

508 S Main St, Alturas, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.