Published January 19, 2024 at 7:00 PM
Updated May 20, 2026
Site work for a water / sewer project in Sarasota, Florida. Completed plans call for site work for a water / sewer project.
The City of Sarasota is soliciting bids for the construction of a 30-inch DIP Raw Water Main Crossing I-75 (Verna). Work includes erosion and sediment control, MOT, temporary steel sheet piling or trench box installation and removal, groundwater dewatering, raw water pumping and disposal, removal and reinstallation of FDOT's precast concrete noise walls, removal and disposal of grand oak tree trunk, installation of line-stops and cast-in-place Reverse Thrust Block, installation of ductile iron piping by slip-line and open-cut, installation of 30" mechanical joint fittings and appurtenances, and ground stabilization and final restoration. Pricing shall include all labor, material, equipment, testing, tax, overhead, and profit necessary to install, construct, and place into service the items described in this bid to provide a complete and functional system ready for use by the City. Q & A deadline: Jan 03, 2024 5:00:00 PM EST 60 calendar days from the Notice to Proceed, with the Final Completion of all Work within the Contract Time of 75 calendar days from the Notice to Proceed for 30-INCH DIP RAW WATER MAIN CROSSING I-75 (VERNA) -CONSTRUCTION. The Work generally includes: 1. Erosion and sediment Control. 2. Maintenance of traffic within the Florida Department of Transportation's right of way. 3. Temporary steel sheet piling or trench box temporary installation and removal 4. Groundwater dewatering. 5. Raw water pumping and disposal. 6. Removal and reinstallation of FDOT's precast concrete noise walls. 7. Removal and disposal of grand oak tree trunk. 8. Installation of line-stops and cast-in-place Reverse Thrust Block. 9. Installation of ductile iron piping by slip-line and open-cut. 10. Installation of 30" mechanical joint fittings and appurtenances. 11. Ground stabilization and final restoration according to FDOT specifications.
Bid Results
Water / Sewer
$1,592,126.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.