BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 26, 2023 at 7:00 PM

Updated January 29, 2024

Renovation of a mixed-use development in Winnipeg, Manitoba. Completed plans call for the renovation of a laboratory facility.

Work of this Contract at the University of Manitoba Fort Garry Campus, Winnipeg, Manitoba. Supply and Installation and connection of Uninterruptible Power Supply (UPS) units to provide back-up power for lab equipment. This also includes the connection of various lab equipment to UPS from new UPS-fed distribution equipment (e.g. sub-panels and receptacles). Documents are available at https://umanitoba.bonfirehub.ca/ * Only those companies, who are on the list of Pre-qualified General Contractors of University of Manitoba, are eligible to bid this project.

Post-Bid

Laboratories

$165,000.00

Public - State/Provincial

Renovation

7

9

2

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
87
Active Projects
35
Bidding Soon
537
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 17, 2024

February 19, 2024

Project location map

125 Dysart Rd, Winnipeg, MB


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.