BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

This is a service / maintenance or supply contract in Fort Bragg, California. Contact the soliciting agency for additional information.

The City of Fort Bragg (City) is seeking proposals from qualified engineering firms interested in contracting with the City to provide construction management and inspection services (CM) for the Fort Bragg Water Treatment Plant Upgrade Project (Project), Project WTR-00017. The City anticipates the start of construction in March 2024. The engineers estimate of construction cost is $10.1 million. The City is seeking services to provide construction inspection and materials testing for the duration of the project. The contract allows 520 working days for completion of the project over two construction seasons. The Water Treatment Plant (WTP) is located at 31301 E. Cedar Street, Fort Bragg, CA 95437. The WTP was originally built in 1958. There was a major treatment process upgrade at the plant in 1986 which made the nominal plant capacity 2.2 MGD. The upgrade replaced the old treatment process with two packaged Trident filter treatment units (FTUs). Since then the treatment process has mostly remained unchanged. The last major improvement project at the plant was constructed in 2004 and modified the raw water storage ponds to construct backwash water storage ponds. The current treatment process relies on the two packaged Trident FTUs. The FTUs receive pumped raw water from two unlined raw water storage ponds. The FTUs employ three basic treatment elements: 1) adsorption, 2) clarification, and 3) filtration, all inside the packaged unit. After raw water is treated by the FTUs the filter effluent is disinfected before it is directed to the finish water clear well. The finish water is then pumped up to storage tanks where it is stored prior to city-wide distribution. The Project is funded by the State Water Resources Control Board (SWRCB), and as such, the funds for this project are federal funds, the project must comply with Federal and State bid contracting guidelines. The Citys project manager will be the CMs primary contact. Proposals will be reviewed and evaluated by the City. Interviews may be required after the City evaluates the proposals. A recommendation for award of contract will be presented to the Fort Bragg City Council on February 12th 2024. The CM is required to attend this meeting to answer any additional questions from the Council. Questions should be directed to: City of Fort Bragg 416 North Franklin Street Fort Bragg CA 95437 John Smith Director of Public Works (707) 961-2823, x 136 E-mail: jsmith@fortbragg.com and Heath Daniels Operations Manager (707) 961-4141 Email: hdaniels@fortbragg.com The method of Contractor Selection has not been Determined at this time.

Conceptual

Water / Sewer

$10,100,000.00

Public - City

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
8
Active Projects
2
Bidding Soon
70
All Active Projects
37
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2024

img_map_placeholder

31301 E Cedar St, Fort Bragg, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.