BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work, paving and renovation of a mixed-use development in Northfield, Illinois. Completed plans call for the renovation of a educational facility; for site work for a service station / car wash facility; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The New Trier Township High School District 203 Board of Education is accepting bids from General Contractors for a renovation project at their high school campus in Northfield, Illinois. The general scope of work includes exterior and interior renovations including, but not limited to, the following: parking lot and drive renovations, parking lot lighting replacement, electric vehicle charging stations, concrete pavement replacement, concrete stair replacement, concrete plaza deck system renovations, and limited interior renovations. The general scope of work includes providing all labor, materials, machinery, tools, equipment, and other means of construction necessary for completion of the work indicated in the Bid Documents including, but not necessarily limited to, the following: temporary facilities and controls, cutting and patching, structure demolition, selective demolition, cast-in-place concrete, metal fabrications, pipe and tube railings, miscellaneous rough carpentry, plastic-laminate-clad architectural cabinets, fluid-applied membrane waterproofing, thermal insulation, sheet metal flashing and trim, penetration firestopping, fire-resistive joint systems, joint sealants, expansion joint assemblies, hollow metal doors and frames, flush wood doors, door hardware, glazing, glazing surface films, non-structural metal framing, gypsum board, acoustical panel ceilings, resilient base and accessories, resilient tile flooring, tile carpeting, exterior painting, interior painting, visual display units, room-identification panel signage, fire protection cabinets, roller window shades, plastic-laminate-clad countertops, fire-suppression sprinkler systems, plumbing, storm drainage piping specialties, heating, ventilating and air-conditioning, electrical, structured cabling for voice and data, extension of existing intercom system and extension of existing fire alarm system, earth moving, bollard covers, asphalt paving, concrete paving, turf and grasses, and storm utility drainage piping. The work site is located at New Trier High School, Northfield Campus, 7 Happ Road, Northfield, IL 60093. On-site construction will commence approximately on Friday, June 7, 2024, dependent on actual school snow days. The Contractor must achieve Substantial Completion for all work on or before Friday, August 16, 2024. Liquidated damages apply to the Substantial Completion date. Required prequalification documentation must be submitted in Adobe PDF format to the District's Architect via the email address listed above on or before 4:00 p.m. local time, Friday, January 5, 2024. A Bidder's failure to submit the required prequalification documentation may be considered grounds for rejection of the Contractor's bid. Each bid must be accompanied by a bid security in the amount of ten percent (10%) of the Base Bid. The successful bidder will be required to furnish construction performance and labor and material payment bonds in the full amount of the Contract Sum. Contractor shall not pay less than the prevailing rates of wages to all laborers, workmen, and mechanics performing work under this contract, and shall comply with the requirements of the Illinois Wages of Employees on Public Works Act (820 ILCS 130/1-12). The Contractor will be required to submit electronic copies of their certified payrolls with each application for payment using the Illinois Department of Labor's Prevailing Wage Portal. The New Trier Township High School District 203 Board of Education reserves the right to accept or reject any or all bids, reject nonconforming bids, reject conditional bids, waive irregularities in the bidding procedures, or to accept any bid that, in its sole opinion, best serves the interests of the School District.

Post-Bid

Educational

$100,000.00

Public - County

Paving, Renovation, Site Work

73

31

5

3

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
193
Active Projects
128
Bidding Soon
2,014
All Active Projects
890
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 15, 2024

June 10, 2024

img_map_placeholder

7 N Happ Rd, Northfield, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.