BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a detention facility in Yuma, Arizona. Completed plans call for the renovation of a detention facility.

**As of March 13th , 2024 project was awarded to Gray Construction but awarded amount is not available.** Before submitting a Proposal, Contractors should carefully examine all provisions set forth herein, visit the site of the work, and fully inform themselves as to all existing field conditions, environment, and limitations. No consideration will be granted for any alleged misunderstanding of the material, practice, articles or piece of equipment to be furnished or work to be done. It is understood that the tender of the Proposal carries with it the agreement to all items and conditions referred to herein or indicated in the Contract Documents. All work MUST be installed/applied in accordance with Authority Having Jurisdiction ("AHJ") and County standards. Should Contractors have any questions regarding this project, they must be submitted to R.E. (Steve) Mendoza, Project Manager via e-mail to Steve.Mendoza@ycso.yumacountyaz.gov. Contractors should reference the project number in the subject of the email. Questions should be submitted by Thursday, December 21, at 12, noon (local time). Questions submitted after this date may not be answered. Before submitting a proposal, Contractors shall carefully examine the bid packet, specifications, and contract documents. Contractors are responsible for understanding field conditions, environment of project, and project site. Yuma County Jail District is not responsible for proposal information based on information received from entities other than the Yuma County Jail District or the Sheriff's Office. The Contractor is responsible for obtaining correct and complete proposal or proposal documents. If appropriate, Contractors shall acknowledge all addenda in their proposal. Failure to acknowledge receipt of Addenda may render the proposal non-responsive and it may be rejected. The successful contractor will be responsible for furnishing all material, rentals, labor, professional services, permits and fees necessary to complete the referenced project: Adult Detention Center Boilers & Pumps Replacement (PM) Work must be performed during business hours 7am-3:30 pm, Monday thru Friday. The selected contractor will perform work as indicated in Sternco Engineers drawings dated 11.9.23. The selected contractor will be responsible for all applicable permit(s) and special inspection(s); if needed or required.

Award

Jails / Prisons

$250,000.00

Public - County

Renovation

26

5

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
14
Active Projects
8
Bidding Soon
55
All Active Projects
27
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 9, 2024

February 8, 2024

img_map_placeholder

200 W Court St, Yuma, AZ

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.