BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a road / highway in Brenham, Texas. Completed plans call for site work for a road / highway.

The deadline to ask questions is 1/02/2024 5:00 PM CST Proposers and Sub-Proposers requiring clarification or interpretation of the Proposal Documents shall make a written request which shall reach the Engineer at least five days prior to the date for receipt of Proposals. Upon consideration of the bids, the City of Brenham reserves the right to accept or reject any and all bids, to waive formalities and technicalities, to make any investigation deemed necessary concerning the bidder's ability to provide the services as covered by the specifications, and to accept what in their judgement is the most advantageous bid. This electric distribution project consists of the installation of: I. Approximately 48' of a directional bore with (3) 4" Schedule 40 conduits which will ultimately have primary cable installed in them, at a minimum depth of 60 II. Approximately 834' of open trench with multiple (3) 4" Schedule 40 conduits which will ultimately have primary cable installed in them, at a minimum depth of 60". Alternate Bid - 834' installed by bore from pull pit or box. III. Two (2) traffic load bearing pull boxes (installed to manufacturer specifications) to be located within S. Austin Street. IV. One (1) load bearing pull box (installed to manufacturer specifications) to be located near the substation fence at the W. Stone Street and S. Austin Street intersection. Contractors are required to field verify the location and depth of any existing underground utilities as required and locate by use of hydro pole-hole to verify any interference during boring. This is included as a lump sum bid item on the bidding sheets. The Contractor shall only furnish any miscellaneous materials required including, but not limited to, concrete, asphalt, backfill material, and water. The City of Brenham will furnish all of the remaining overhead and underground electric materials including conduit for this project. The Contractor shall include the miscellaneous material price in their bid unit pricing. The City shall be allowed the opportunity to inspect the installation of conduit and boxes at various stages of construction to ensure adherence to the COB specifications. Contractor may provide photos of installation if City staff are not available. The total number of calendar days to be substantially complete with construction is 180 days.

Post-Bid

Roads / Highways

$3,000,000.00

Public - City

Site Work

3

15

2

6

Subscribe For Documents

42 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
131
Active Projects
83
Bidding Soon
3,086
All Active Projects
1,063
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 9, 2024

March 11, 2024

img_map_placeholder

Multiple Locations, Brenham, TX


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.