Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published December 15, 2023 at 7:00 PM
Updated January 29, 2024
Renovation of a day care center in Basalt, Colorado. Conceptual plans call for the renovation of a 4,000-square-foot day care center.
Reference Number 0000337166 Job Location: Basalt, CO Question Acceptance Deadline 12/19/2023 05:00 PM MT Questions are submitted online Yes, Questions may be submitted directly to Michelle Thibeault, Planning Director, Michelle.Thibeault@basalt.net. Questions received, answers and other clarifications will be distributed to all Proposers via email. Preconstruction Services: The awarded GC firm will collaborate with the Town of Basalt, Blue Lake Preschool, and Bryan May Architects through the remainder of the design phase to ensure the design meets the Project's goals. The attached Stott's Mill Childcare Center design plans are approximately 90% complete, the requested guaranteed maximum pricing should be based upon these plans. The responsibilities of the GC during Preconstruction will include, but are not limited to: 1. Plan Reviews (provide feedback for constructability and completeness at contract kick-off) 2. Value Engineering 3. Scheduling 4. Preconstruction Meetings \ Site Walks (up to (3) - one (1) hour preconstruction meetings, this total excludes the VE workshops.) Construction Services: The responsibilities of the GC during the Construction Services phase generally consist of providing the oversight, administration, equipment, materials, supplies, and personnel necessary to complete the project as outlined in the Construction Document set. The anticipated scope of the project includes: 1. New interior build-out of 4,000 sq. ft. childcare center 2. Run a weekly O.A.C. (Owner/Architect/Contractor) meeting throughout the project, take minutes, and disseminate notes weekly. 3. The GC will coordinate all contract activities between the GC and sub-consultant(s) as well as ensure that the project work is completed on schedule and within budget. 4. Any documents, reports or similar required by the state to fulfill the grant requirements. The Town of Basalt reserves the right to reject any or all Proposals or accept what is, in its judgment, the Proposal which is in the Town of Basalt's best interest. The Town of Basalt further reserves the right, in the best interests of the Town of Basalt, to waive any technical defects or irregularities in any and all Proposals submitted.
Conceptual
Day Care Centers
$389,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 8, 2025
200 201 Clement Street, Basalt, CO
Related To This Project
Basalt, CO
Bid Date: Jan 30 2024
Basalt, CO
Bid Date: Mar 04 2024
Basalt, CO
Bid Date: Mar 01 2024
Basalt, CO
Bid Date: Feb 16 2024
Basalt, CO
Bid Date: Mar 01 2024
Basalt, CO
Bid Date: Feb 23 2024
Basalt, CO
Bid Date: Feb 23 2024
Basalt, CO
--
Basalt, CO
Bid Date: Dec 01 2021
Basalt, CO
Bid Date: Jan 04 2022
Basalt, CO
--
Basalt, CO
Bid Date: May 07 2021
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed