BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a mixed-use development in San Francisco, California. Completed plans call for site work for a playground / park / athletic field; for paving for a playground / park / athletic field; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

8.4% MBE; 4.7% WBE; 6.9% OBE. LBE Subcontracting Participation Requirement is 20% LBE The Stern Grove Playground Renovation includes the complete renovation of an existing children's play area located at Sigmund Stern Recreation Grove. The project site is located off of Sloat Boulevard, near the intersection with 21st Avenue. The scope includes demolition; stump removal; removal and disposal of hazardous materials; soil and sand; grading; drainage; soil improvement; utility work; structural concrete work; paving; wooden boardwalk; new playground; fencing; planting and irrigation; and incidental work. The estimated construction cost is approximately $1,803,147.00. Healthcare Security Ordinance o Pre-bid and pre-construction information o Paid Sick Leave Ordinance Fact Sheet Effective March 1, 2015, no contractor or subcontractor may be listed in a bid for a public works project unless registered with the DIR as required by Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. o DISCLAIMER: The information provided below is a summary of the project. Addenda and other bid changes will be distributed by email only to Plan Holders with email addresses and will be posted on the DPW Electronic Bid Documents Download Site. o DPW is not liable for damages or costs incurred in connection with the use of, or any reliance upon, any information contained on this website. The bid information is subject to typographical error. Event ID: SFGOV-0000008708Format/Type: Sell Event RFxRound: 1Version: 1

Bid Results

Playgrounds / Parks / Athletic Fields

$2,170,000.00

Public - City

Paving, Site Work

55

21

12

6

Subscribe For Documents

73 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
152
Active Projects
79
Bidding Soon
1,783
All Active Projects
739
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 10, 2024

March 11, 2024

img_map_placeholder

2899 19th Ave, San Francisco, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.