Site work for a water / sewer project in Hoschton, Georgia. Completed plans call for site work for a water / sewer project.
For furnishing all materials, labor, tools, equipment, and any other miscellaneous items necessary for the construction of Water Distribution System Improvements Phase 1B in Hoschton, Georgia. All bids will be evaluated by OWNER and the project will be awarded, if it is awarded, within sixty (60) days of the bid opening. If a bidder is not selected within sixty (60) days of the bid opening, any bidder that is determined by the OWNER to be unlikely of being selected for contract award shall be released from their bid. The award of this bid proposal, if awarded, shall be based on several criteria, including prices bid, experience in the work proposed, and references. Refer to Article 14 of Section 00100 for criteria and award method. Water Distribution System Improvements Phase 1B for the City of Hoschton, Georgia Sealed bids will be received by the City of Hoschton, Georgia (OWNER), for furnishing all materials, labor, tools, equipment, and any other miscellaneous items necessary for the construction of the Water Distribution System Improvements Phase 1B in Hoschton, Georgia. All bids will be evaluated by OWNER and the project will be awarded, if it is awarded, within sixty (60) days of the bid opening. If a bidder is not selected within sixty (60) days of the bid opening, any bidder that is determined by the OWNER to be unlikely of being selected for contract award shall be released from their bid. The award of this bid proposal, if awarded, shall be based on several criteria, including prices bid, experience in the work proposed, and references. Refer to Article 14 of Section 00100 for criteria and award method. The Project consists of, but is not limited to the following major elements: Installation of approximately 3,765 LF of 12-inch waterline, 145 LF of jack and bores, abandonment of existing waterlines, reconnection to existing waterlines, meter reconnections, fire hydrants, valves and associated appurtenances. The Project consists of, but is not limited to the following major elements: Installation of approximately 3,765 LF of 12-inch waterline, 145 LF of jack and bores, abandonment of existing waterlines, reconnection to existing waterlines, meter reconnections, fire hydrants, valves and associated appurtenances. Time of completion for all work associated with this project shall be one hundred eighty (180) consecutive calendar days from the date of a written "Notice to Proceed" from OWNER. OWNER requires a bid bond* or a certified cashier's check in the amount of five percent (5%) of the total bid to be enclosed with the bid at the time of bid opening. Cashier's check will be made payable to the City of Hoschton. The successful bidder will be required to furnish OWNER with Insurance, Workman's Compensation Insurance, and Performance and Payment Bonds* in the amount of one-hundred percent (100%) of the total bid. Each bid must be submitted in a SEALED ENVELOPE, addressed to the OWNER. Each sealed envelope containing a Bid must be plainly marked on the outside as, " Water Distribution System Improvements Phase 1B - for the City of Hoschton, Georgia". If bid is forwarded by mail, the sealed envelope containing the Bid must be enclosed in a separate mailing envelope to the attention of the OWNER at the address previously given. All Bids must be made out on the bid form of the type bound in the Contract Documents, in accordance with the instructions in the Information for Bidders. No interlineation, additions, or deletions shall be made in the proposal form by the BIDDER. Any and all Bids received without the aforementioned qualification criteria enclosed, will be returned to the BIDDER. CONTRACTORS and SUBCONTRACTORS bidding on this Project will be required to comply with all Federal, State, and local laws. OWNER reserves the right to waive any informalities or to reject any or all Bids, to evaluate Bids, and to accept any Bid which in its opinion may be in the best interest of the OWNER. No Bid will be rejected without just cause. Successful Bidder will be required to perform WORK as the Prime Contractor. WORK performed by Prime Contractor shall be at a minimum 30% of the contract value. No BIDDER may withdraw his bid within the time limit specified in the Instruction to Bidders (Section 00100). The City has acquired all necessary State and Federal permits in connection with this project. * Surety and insurance companies must have an AM Best rating of A-6 or greater, be listed in the Federal Registry of Companies holding Certificates of Authority and Acceptable Sureties on Federal Bonds, be licensed by the Georgia Insurance Department and the Georgia Secretary of State to do business in the State of Georgia. Surety companies executing Bonds must appear on the Treasury Department's most current list (Circular 570 as amended) For Performance Bonds less than $300,000 an irrevocable Letter of Credit from a bank as defined in O.C.G.A. Code Section 7-1-4 may be submitted in lieu of a bond. In lieu of a Payment Bond, a Cashier's Check, Certified Check, or Cash may be submitted in an amount not less than the total amount payable by the terms of the CONTRACT. Document Notes : The Information for Bidders, Bid Proposal Form, Form of Agreement, Drawings, Specifications, and forms of Bid Bond, Performance Bond, Payment Bond, Bidders Qualification Forms, and other Contract Documents may be examined at the following locations: OWNER: City of Hoschton 61 City Square Street Hoschton, GA 30548 706-654-3034 (T) ENGINEER: Engineering Management, Inc. 303 Swanson Drive Lawrenceville, GA 30043 770-962-1387 (T) 770-962-8010 (F) The award of this bid proposal, if awarded, shall be based on several criteria, including prices bid, experience in the work proposed, and references. Refer to Article 14 of Section 00100 for criteria and award method. The Project consists of, but is not limited to the following major elements: Installation of approximately 3,765 LF of 12-inch waterline, 145 LF of jack and bores, abandonment of existing waterlines, reconnection to existing waterlines, meter reconnections, fire hydrants, valves and associated appurtenances. For purchasing documents regarding this project, you may contact Joyce Sapp at 770-962-1387 or jsapp@eminc.biz. For technical questions regarding this project, you may contact Greg Bennett at 770-962-1387 or gbennett@eminc.biz.
Bid Results
Water / Sewer
$948,432.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 17, 2024
March 18, 2024
Multiple Locations, Hoschton, GA
Related To This Project
Hoschton, GA
Bid Date: Jan 16 2024
Hoschton, GA
Bid Date: Feb 09 2024
Hoschton, GA
Bid Date: Mar 15 2024
Hoschton, GA
Bid Date: May 30 2024
Hoschton, GA
Bid Date: Jul 17 2024
Hoschton, GA
Bid Date: Jul 17 2024
Hoschton, GA
Bid Date: Jul 17 2024
Hoschton, GA
Bid Date: Sep 05 2024
Hoschton, GA
Bid Date: Jan 10 2024
Hoschton, GA
Bid Date: Aug 06 2020
Hoschton, GA
Bid Date: Jul 16 2021
Hoschton, GA
Bid Date: Apr 06 2022
Hoschton, GA
--
Hoschton, GA
Bid Date: Jul 07 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.