Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a playground / park / athletic field in Pacifica, California. Completed plans call for site work for a playground / park / athletic field.
Fairway Park Backstops Replacement The project will remove and install the backstops at all three baseball fields at Fairway Park. The work includes removing the existing backstops and installing 20' high backstops with foul ball overhangs, installing fences, safety panels, and other miscellaneous work. Question Deadline 12/28/2023 at 5:00 PM PT. Question Response Deadline: January 4, 2024, 2:00pm Project Contact: Bryan Bautista Assistant Civil Engineer Email: bbautista@pacifica.gov Phone: (650) 738-3769 Procurement Contact: Gino Assereto Superintendent Email: gassereto@ci.pacifica.ca.us Phone: (650) 501-0305 The bids will be publicly opened, examined and declared by the City Clerk; said bids, after being publicly opened, examined and declared, will be calculated by the Engineer, their report returned to the City Clerk, and the report of the results of the bidding and the calculations of the Engineer will be reported to the City Council of the City of Pacifica at the next regular meeting thereof. The City Council of the City of Pacifica reserves the right to reject any and all proposals or bids, should it deem this necessary for the public good, waive any irregularities in any bids and its determination as to which bid is the lowest responsible bid and it may also reject the bid of any bidder who has been delinquent or unfaithful in any former contract with the City of Pacifica for the best interest of the City shall be final. The City shall have SIXTY (60) calendar days from and after the opening of the bids within which to make its determination. The City will only accept completed bid packages submitted electronically by authenticated submitters up to the date and time as specified in the Notice to Bidders; without exception, responses will not be accepted after the submission deadline regardless of any technical difficulties such as poor internet connections. The City strongly recommends completing your response well ahead of the deadline. Each bid must be accompanied by a cashier's check, certified check, or Bidder's Bond executed by a corporate surety authorized to engage in such business in the State of California, payable to the City of Pacifica, in an amount not less than ten percent (10%) of the amount of the Base Bid. The successful bidder will be required to furnish a Performance Bond in an amount equal to one-hundred percent (100%) of the contract price, and a Labor and Material Bond in an amount equal to one-hundred percent (100%) of the contract price. Said bonds shall also be executed by a corporate surety authorized to engage in such business in the State of California and be made payable to the City of Pacifica. Original Bidder's Bond with surety seal must be MAILED and postmarked no later than Thursday, January 4, 2024 addressed to the: City Clerk, Pacifica Community Center 540 Crespi Drive Pacifica CA 94404 If the successful bidder fails, neglects, or refuses for TEN (10) calendar days after the award of the contract to enter into the contract to perform the work, the cashier's check, certified check, or Bidder's Bond accompanying the bid and the amount therein named, shall be declared forfeited to the City and shall be collected by it and paid into its general fund. No bidder may withdraw his/her bid for a period of SIXTY (60) calendar days after the date set for the opening thereof, and the same shall be subject to acceptance by the City during this period The City reserves the right to reject any or all bids, waive any irregularities in any bids and its determination as to which bid is the lowest responsible bid and is for the best interest of the City shall be final. The City shall have SIXTY (60) calendar days from and after the opening of the bids within which to make its determination. Contractor to hold bid prices for a period of 180 days from date of bid submission. The Contractor receiving the award of the contract shall begin work after 1/10/2024 and within FIFTEEN (15) calendar days after receipt of the Notice to Proceed and shall diligently prosecute the same to completion within the time restrictions as listed in the technical specifications and all work shall be completed by the time allotted in the technical specifications. The Contractor shall have Thirty (30) working days to complete this project. Working days will be counted upon the Contractor's receipt of the Notice to Proceed, as noted above. At the time the Contractor's bid proposal is submitted, the Contractor shall possess a valid Class B - California General Building Contractor's License California General Contractor's License. The Contractor shall also possess a valid City of Pacifica Business License at the time the contract is awarded. The City of Pacifica hereby notifies all bidders that it will affirmatively insure that the contract entered into pursuant to this advertisement will be awarded to the lowest responsible bidder without discrimination on the grounds of race, color, national origin, sex, religion, age or disability. The Contractor or subcontractor shall not discriminate on the basis of race, color, national origin, or sex in the performance of this contract. The contractor shall carry out applicable requirements of 49 CFR, Part 26 in the award and administration of DOT-assisted contracts. Failure by the Contractor to carry out these requirements is a material breach of this contract, which may results in the termination of this contract, or such other remedy as recipient deems appropriate. The Contract, if awarded, will be awarded to the lowest responsible bidder subject to Owner's right to reject any or all bids and to waive any informality in the bids or the bidding. The City, at its sole discretion, may reject all bids. Additionally, individual proposals may be rejected if (among other things) they any alteration of form, additions not called for, conditional bids, incomplete bids, erasures, or irregularities of any kind, or a disproportionate amount of payment being made on any item of work during any phase of the project, or fail to provide a price on al bid items, including all alternates or proposals submitted which are in strict compliance with the directions in the Notice to Contractors. The City may, in its sole discretion, waive any informalities or minor irregularities in the bid or proposal. Proposals not submitted in strict compliance with the directions in the Notice to Contractors may, in City's sole discretion, be deemed non-responsive and rejected on that basis. When proposals are signed by an agent, other than the officer or officers of a corporation authorized to sign contracts on its behalf or a member of a co-partnership, a "Power of Attorney" must be on file with the City Clerk prior to opening bids or shall be submitted with the proposal; otherwise, the proposal may be rejected at the City's sole discretion as irregular and unauthorized. Proof of authority of the person or persons signing on behalf of the bidder shall be provided to the City upon request after the bid opening. If any person contemplating submitting a bid for the construction of the Project is in doubt as to the true meaning of any part of the Plans, Specifications, or other Contract Documents, or finds discrepancies in, or omissions from the Plans or Specifications, he/she may submit to Owner a written request for an interpretation or correction thereof not later than 5 working days before the date bids will be opened through electronically. The person submitting the request will be responsible for its prompt delivery. Any interpretation or correction of the Contract Documents will be made only by addendum and will be mailed or delivered to each person receiving a set of such documents. Owner will not be responsible for any other explanation or interpretation of the Contract Documents. Time of Completion: The Contractor shall begin work as stipulated in the Notice to Proceed. The Contractor shall diligently prosecute the work to completion before the expiration of thirty (30) working days after the date of the first working day. The time of completion shall include all allowances for mobilization and total completion of all work including final punch list work and final clean up. Liquidated Damages: Time is of the essence for completion of this project. The Contractor shall pay to the City of Pacifica the sum of Three Thousand Six Hundred Dollars ($3600) per day for each and every calendar day's delay in the finishing of the work in excess of working days prescribed above. Liquidated damages shall also be assessed for non-compliance with the requirements stated in "Hours of Work" under Section 10-1, "General Construction Requirements," of these Special Provisions, and Section 10-2, "Traffic Control Requirements."
Bid Results
Playgrounds / Parks / Athletic Fields
$174,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 11, 2024
February 12, 2024
To Be Determined, Pacifica, CA
Related To This Project
Pacifica, CA
Bid Date: Jan 25 2024
Pacifica, CA
Bid Date: Feb 14 2024
Pacifica, CA
Bid Date: Feb 16 2024
Pacifica, CA
Bid Date: Feb 15 2024
Pacifica, CA
--
Pacifica, CA
Bid Date: Oct 01 2019
Pacifica, CA
Bid Date: Feb 16 2024
Pacifica, CA
Bid Date: Jun 18 2020
Pacifica, CA
Bid Date: Sep 15 2020
Pacifica, CA
--
Pacifica, CA
Bid Date: Dec 15 2023
Pacifica, CA
Bid Date: Nov 28 2023
Pacifica, CA
Bid Date: Nov 28 2023
Pacifica, CA
Bid Date: Oct 31 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.