Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 5, 2024 at 7:00 PM

Updated February 6, 2024

Site work and paving for a mixed-use development in Elgin, Illinois. Working plans call for site work for a playground / park / athletic field; water / sewer project; road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

As of January 29,2024, this project has not yet been awarded. A timeline for award has not yet been established. Questions regarding this bid package can be directed to Liz Dafoe of Upland Design Ltd at 312.350.4088 ext 301 Dated December 06, 2023. The proposed improvement includes removal of existing playground and surfacing, asphalt paving, concrete paving, curb, asphalt color coat and crack repair, artificial turf with playground pad, chain-link vinyl coated fencing and gates, playground equipment, site furnishings, pickleball installation, rain garden, underdrainage, landscaping and all other appurtenant work and materials necessary to complete the project. An original bid bond (in the amount of 5% of the original bid amount). The bid bond with surety satisfactory to the City, in either surety bond, cash, certified check, cashier's check, or bank money order on a solvent bank shall be made payable to the City of Elgin, Illinois. The sum shall be forfeited in the case the successful bidder fails to enter into a binding contract and provide a properly executed surety bond within 15 days after the date the contract is awarded by the City Council. The bidder shall submit a list of qualified references for projects of similar size and scope of this project. Proposals withdrawn may not be re submitted at the same letting. Each bidder shall satisfy the City as to their ability, financially or otherwise, to carry out the work. The successful bidder shall pay prevailing wage, shall provide certified payrolls to the City for the duration of the project and comply with the Responsible Bidder's Ordinance and Elgin Residency Ordinance for the duration of the project. Minority business firms are encouraged to submit bids. Successful contract bidders are also encouraged to utilize minority businesses as sub-contractors for supplies, equipment, services, and construction. This project is being financed, in part, with funds from the Illinois Department of Natural Resources, "Open Space Lands Acquisition & Development" (OSLAD) grant program. The City of Elgin reserves the right to reject any and all bids and/or to waive any informality in any bids. The successful bidder shall be required to furnish a satisfactory contract bond to the City of Elgin by a surety company authorized to do business in the State of Illinois covering the full amount of the contract. Project has been cancelled.

Final Planning

Playgrounds / Parks / Athletic Fields

$656,513.00

Public - City

Paving, Site Work

14

13

4

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 5, 2024

February 5, 2024

Project location map

1770 Newbridge Cir, Elgin, IL

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed