BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 7, 2024 at 7:00 PM

Updated February 8, 2024

Site work and paving for a mixed-use development in Lockport, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

**As of February 7, 2024, project was awarded to Austin Tyler Corp., Inc., awarded amount is $5,778,413.32..** 2024 Roadway Reconstruction & Water Main Replacement Project Site Directions: 12th Street (State Street to Garfield Ave) Washington Street (13th Street to 11th Street) Lincoln Street (Division Street to 9th Street) Replacement, Storm Sewer Installation, Drainage Structure Installation, Aggregate Base Course, Pcc Sidewalk Removal And Replacement for Ada Compliance, Sidewalk Infill, Curb and Gutter Removal and Replacement, Driveway Removal And Replacement, Hma Surface Removal, Class D Patching, Hma Binder Course, Hma Surface Course, Pavement Markings, Regulatory Signs, Parkway Restoration, and All Incidental and Collateral Work Necessary to Complete the Project All in Accordance With the Specifications and Contract Documents No. 23-205 for the 2024 Roadway Reconstruction & Water Main Replacement Project (12th St., Washington St. And Lincoln St.). Prospective Bidders Are Advised to Carefully Review the Plan, General Conditions, Special Conditions, Special Provisions, and Details of This Document. Prequalification: Prequalification by Idot Will Be Required of All Contractors and Subcontractors on This Project in the Respective Discipline(S) They Will Be Responsible for Constructing. Hma Contractor Must Be Prequalified With the "003 - Hot-mix Asphalt (Hma) Plant Mix" This project is located on 12th Street (State St. to Garfield St.), Washington Street (13th St. to 11th St.), and Lincoln Street (Division St. to 9th St.) in the City of Lockport, Will County, Illinois. A pre-construction meeting will be scheduled by the City following the execution of the Contract and prior to the start of construction. At the preconstruction meeting the Contractor will be requested to furnish the City fluorescent pink and/or white water-based marking spray paint, bundle of pointed hardwood oak lath, bundle of hardwood oak stakes (2" x 2") and ribbon. Additional spray paint, lath or other materials listed may be requested during the project. These are for marking the proposed improvements and related work. The cost shall be included in the cost of the contract.

Award

Roads / Highways

$5,778,413.00

Public - City

Paving, Site Work

88

7

17

5

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
436
Active Projects
241
Bidding Soon
3,262
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 16, 2024

March 20, 2024

Project location map

Multiple Locations, Lockport, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.