BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 17, 2025 at 8:00 PM

Updated September 18, 2025

Site work and paving for a mixed-use development in Ashland, Missouri. Design plans call for site work for a playground / park / athletic field; for paving for a playground / park / athletic field; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

As of September 17, 2025, per owner, this was an RFQ over a year ago. There is no construction associated with this project. The parks & recreation board contracted with a design team to create a master plan. In FY2026, they will hire an engineering firm to develop construction plans for Phase 1 improvements, which will include the following projects: • Project C: Retention Basin - Estimated cost: $792,276 • Project F: Playground/Comfort Station - Estimated cost: $2,868,052 Engineering design is expected to take approximately 18 months. Park-related grant programs generally have a submission deadline in October or late fall, and it is expected that grant applications will begin in the fall of 2026. The target for completing Phase 1 improvements is set for summer 2030 Introduction: The City of Ashland, Missouri is seeking qualified design firms to submit their qualifications for the improvement of City Park. The objective of this project is to enhance the overall functionality, aesthetics, and accessibility of the park for the benefit of the community by drawing from the 2020 Comprehensive Plan, the 2023 Parks and Recreation Master Plan, the goals of the Parks and Recreation Board, and the community to bring improvement to the park. The Park Board has spent 2023 investing in our central City Park in an effort to make improvements and bring the park to a level of developed completion. Through their work on the Parks and Recreation Master Plan with Drury University, the Park Board has determined that the next logical step is to engage with a firm to help guide the Park Board towards bringing their goals and ideas to reality. The Park Board has put together thoughts of what they would like to see incorporated into the park or addressed as part of improvements. Their list includes, but is not limited to: - Provide for ADA compliant and accessible features - Improve lighting throughout and especially along the trails - Ensure complete trail and pedestrian-way connections - Improve access across the stormwater drainage-way through the park - Provide connection to adjacent neighborhoods and properties - Update and enhance existing shelters - Ensure adequate amenities throughout such as drinking fountains, benches, bike racks, etc. - Improve aesthetics through enhanced landscaping and low maintenance plantings - Add sports and athletic features where possible such as a basketball court or other additional active rec spaces Project Overview: The selected design firm will be responsible for providing comprehensive design services for the improvement of City Park. This may include, but is not limited to, landscape design, infrastructure improvements, accessibility enhancements, recreational facilities, and sustainable design features. The Park Board envisions taking this project from design to construction immediately. The ideal firm will have the capacity to conduct design work in a fashion that enables the Park Board to be successful in the implementation of improvements in conjunction with their annual budget. The Park Board anticipates building upon recent grant funded project successes by applying for Land and Water Conservation Funding in the fall of 2024 to move improvements identified in this project towards construction and completion Contact Information: For questions or additional information, please contact: Kyle Michel, City Administrator 571-657-2091 kmichel@ashlandmo.us

Design

Playgrounds / Parks / Athletic Fields

$3,660,328.00

Public - City

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
63
Active Projects
29
Bidding Soon
411
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 29, 2027

Project location map

399 N College St, Ashland, MO


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.