BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a mixed-use development in Kearney, Nebraska. Completed plans call for site work for a power facility.

Nebraska Public Power District (DISTRICT) is seeking a Contractor to provide demolition / grading / access road construction modifications to the Kearney Tech1 Temporary 115kV substation located near Kearney, Nebraska. The CONTRACTOR shall supply all labor, supervision, miscellaneous materials, tools, and equipment for performing modifications to the DISTRICT'S Kearney Tech1 temporary 115kV substation located near Kearney, Nebraska in accordance with the Contract drawings and Construction Standards included in ATTACHMENT B. The work scope involves the removal and disposal of fencings, ground grid, foundations, conduit, below grade concrete man-hole, relocation of existing substation rock and dirt, along with the grading and construction of a new access road to adjacent substation site. General description of the work being performed is as follows: Remove fencing and fencing foundations. CONTRACTOR responsible for disposal. Scrape up existing crushed limestone substation rock and pile at location directed by the DISTRICT. Rock to be used later in construction of new access road to adjacent substation. Estimated quantity of 1300 tons Remove ground grid (estimated at 30" deep). CONTRACTOR responsible for disposal. Remove below grade conduit (estimated 24"-48" deep). CONTRACTOR responsible for disposal. o Remove below grade concrete man-hole. CONTRACTOR responsible for disposal. o Remove foundations and dispose of all concrete rubble and waste. Backfill foundation holes and compact per DISTRICT specifications. Use existing spoils from site. Remove existing fill dirt to original grade and place spoils in location directed by the DISTRICT. Spoils to be used later in construction of new access road to adjacent substation. Estimated quantity of 3000 Cubic Yards .Relocate dirt piles on site for use on new access road. Estimated quantity of 475 Cubic Yards. Contact for questions: Kyle Sundberg, Buyer Phone: (402) 362-7319 E-mail: kjsundb@nppd.com

Post-Bid

Power Plant

$480,000.00

Public - State/Provincial

Site Work

10

3

2

Subscribe For Documents

47 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
19
Active Projects
14
Bidding Soon
127
All Active Projects
58
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 8, 2024

February 7, 2024

img_map_placeholder

To Be Determined, Kearney, NE

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.