Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published February 27, 2024 at 7:00 PM
Updated October 1, 2024
Renovation of an educational facility in Lexington, Kentucky. Completed plans call for the renovation of a educational facility.
This is an invitation to submit a sealed bid for painting the exterior of William Wells Brown Elementary School. Please review drawing attachment titled W.W. Brown Exterior Paint for Scope of Work Term of Contract: February 27, 2024 - May 6, 2024 It is not recommended to overnight responses as they may not arrive by the deadline. It is the companys responsibility to ensure the bid arrives at the specified location by the date and time of the bid opening. Bids should not be addressed to a specific person. The FCPS Purchasing Office is closed and does not accept mail, commercial carriers or hand delivered bids on weekends and Holidays. Regular hours are 7:00 AM to 3:00 PM Eastern Time. Any bids received after the due date listed on the cover page shall be considered a late bid. A late bid shall not be considered for award except under the following conditions only: It was sent by registered or certified mail not later than the fifth (5th) calendar date prior to the due date specified on the cover; or The bid was sent by mail and it is determined by the Purchasing Department that the late receipt was due solely to the mishandling by the FCPS after receipt at the address specified in the solicitation. If an emergency or unanticipated event or closing interrupts or suspends normal FCPS business operations so that bids cannot be received at the FCPS Purchasing Office by the due date stated on the cover page, the due date/time specified will be deemed to be extended to the same time of day specified in the solicitation on the first work day on which normal FCPS business operations resume. The official time used for receipt of bids is the satellite clock located in the conference room 131 where the bid opening shall occur. This clock is connected by satellite to be the official time of the United States as determined by the National Institute of Standards and Technology (NIST) and U. S. Naval Observatory (USNO). A late hand carried bid shall not be considered Submit to Board: ------ January 16, 2024 Board Approval: ------ February 26, 2024 Pre-Con: --------------- March 4, 2024 on site Work Starts: ----------- March 5, 2024 Work Complete: ------ May 6, 2024 Bidders are invited to attend the bid opening and requested to not telephone for tabulation. FCPS staff provides notification following awards by The Board. Question Deadline 01/10/2024 at 2:00 PM ET All questions must be submitted in writing through Electronically All work shall be coordinated with the FCPS Facility Design & Construction Office 1. Lars Finneseth: lars.finneseth@fayette.kyschools.us (859) 948-0422 2. Scott Fitch; scott.fitch@fayette.kyschools.us (859) 396-6005 A bid bond for 5% of the bid must be included with bid submission A performance and payment bond for 100% of the bid must be submitted upon award and prior to work beginning
Award
Educational
$134,145.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 16, 2024
March 5, 2024
555 E Fifth St, Lexington, KY
Related To This Project
Lexington, KY
Bid Date: Nov 19 2024
Lexington, KY
Bid Date: Jan 23 2024
Lexington, KY
Bid Date: Jun 02 2020
Lexington, KY
Bid Date: Jan 25 2024
Lexington, KY
Bid Date: Jan 26 2024
Lexington, KY
Bid Date: Jan 25 2024
Lexington, KY
Bid Date: Feb 07 2024
Lexington, KY
Bid Date: Jan 17 2024
Lexington, KY
Bid Date: Jan 04 2024
Lexington, KY
Bid Date: Jan 17 2024
Lexington, KY
Bid Date: Jan 10 2024
Lexington, KY
Bid Date: Feb 29 2024
Lexington, KY
Bid Date: Dec 22 2023
Lexington, KY
Bid Date: Jan 31 2024
UK Construct Health Education Building TC-002 Early Subcontractor Involvement Curtain Wall - 5255605
Lexington, KY
Bid Date: Jan 10 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.