BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Saint Louis, Missouri. Contact the soliciting agency for additional information.

Comprehensive Analysis and Plan for a Transportation Development District Within the West Florissant Great Streets District Questions Submitted by Friday, December 29, 2023 Questions Answered by Friday, January 5, 2024 Questions about this RFP should be sent by email to mdemarco@stlpartnership.com. Any answers to questions will be provided to all interested parties and released as an addendum to this RFP on the Partnership's website. Electronic proposals should be sent by email to mdemarco@stlpartnership.com. This project will resurface the existing roadway pavement and install sidewalk improvements, a shared-use path, additional signalized pedestrian crossings, transit improvements, lighting, landscaping, and amenities from Solway Avenue to Stein Road. Construction of both projects is anticipated to commence in the Fall of 2024 and be completed in the Fall of 2026 (see attached Map WFGS Project Area). Currently, all funding that has been secured for these projects will only cover the construction or installation of the above-listed improvements. To ensure that these projects are a long-term success, local funding for the operations and maintenance of the corridor and amenities must be secured. Ideally, future operations and maintenance activities would include, but would not be limited to, the maintenance of landscaped areas, trash pickup and debris removal, the maintenance of furnishings (benches, trash receptacles, etc.), and the maintenance of wayfinding signage. Additional funding sources are being investigated to continue these corridor improvements northward to Pershall Road via another future project. Project Objective and Scope of Work The selected firm will be responsible for providing two TDD analyses and a TDD recommended implementation plan that will serve as the basis for a community education and implementation campaign to establish a WFGS TDD within a reasonable time frame (12-18 months). o The first analysis must include: o A legal boundary that includes the project area of West Florissant Avenue between Solway Avenue and Stein Road. o An analysis of revenue collection opportunities within the proposed TDD boundary that would raise a minimum of $500,000 annually. Revenue collection may include sales tax, real estate tax, and assessment tax. It should also be feasible, sustainable, and show consideration for and analysis of progressive taxation methods eligible under Missouri law. o The second analysis must include all the above AND o A legal boundary that may extend as far north as Pershall Road and as far south as Acme Avenue (6400 Block of West Florissant Road. o An analysis of possible revenue collection opportunities within the proposed TDD boundary that would raise a minimum of $1,000,000 annually. o The TDD implementation recommendation should include a comprehensive cost-benefit analysis that evaluates the economic, legal, and civil feasibility of establishing a WFGS TDD. The analyses may serve as a basis for a public engagement, education, and implementation campaign. Short and long-term costs and benefits, include: o Impacts on local households, businesses, municipalities, and other stakeholders along the WFGS corridor. o Bureaucratic and civic considerations. o TDD governance and fund distribution recommendations. o An implementation schedule and roadmap outlining the steps required to establish the TDD, including legal, administrative, and community engagement. o Likely implementation costs, including financial, time, and talent. o A summary of eligible expenses a TDD may support beyond construction, operations, and maintenance -- such as design and planning. The primary objective of the TDD is to generate funding to support WFGS construction and design improvements as well as operations and maintenance costs, which are estimated to be between $500,000 to $1,000,000 annually *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Conceptual

Roads / Highways

$1,000,000.00

Public - County

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
78
Active Projects
36
Bidding Soon
808
All Active Projects
317
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 19, 2024

img_map_placeholder

Multiple Locations, Saint Louis, MO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.