BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 19, 2023 at 7:00 PM

Updated January 29, 2024

This is a service / maintenance or supply contract in Columbus, Ohio. Contact the soliciting agency for additional information.

The Ohio Water Development Authority (OWDA) is seeking proposals from consulting firms to develop a comprehensive Regional Water Study (RWS) for a 15-County area of Central Ohio. OWDA will be signatory on the contractual documents, while management of the project will be handled by the Partner Agencies, the Ohio Environmental Protection Agency (OEPA) and Ohio Department of Natural Resources (ODNR). The project has an anticipated performance period of March through December 2024. The RWS will inform and support equitable future growth and economic development decisions that ensure sustainable and resilient water resources. It will be a guiding document to be used in decision making for infrastructure investments and policy making for the next 20+ years. Currently in Ohio, water resource management and water quality protection activities are driven by an array of state and local regulations, land use planning decisions, and site-specific conditions. There is no comprehensive framework to visualize a more integrated approach to environmental stewardship in general and water resource sustainability specifically. In recognition of this, the State of Ohio has called for the development of a long-range comprehensive water resources analysis for each region of the State. Each region has unique driving forces, constraints, challenges, and opportunities that will be addressed in these RWSs. It is anticipated that all regions will be completed over the next few years and likely be repeated on a determined frequency. Question Deadline 01/17/2024 at 5:00 PM ET Should any Proposer find discrepancies, omissions or ambiguities in this RFP, the Proposer must submit a question/request for clarification by email to Ms. Kavalec. All confirmed proposers will receive an email with the questions official response Clarification Responses Due 1/19/24 5:00 PM (local time). Estimated Notice to Proceed 3/1/24. Project Completed 12/31/24. The proposal must address the following items in the following order. Failure of the proposal to respond to a specific requirement may be basis for elimination from consideration during the comparative evaluation. OWDA reserves the right to accept or reject any or all proposals. The method of Contractor Selection has not been Determined at this time.

Conceptual

Water / Sewer

Public - City

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
196
Active Projects
74
Bidding Soon
1,625
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 26, 2024

Project location map

Multiple Locations, Columbus, OH


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.