BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a playground / park / athletic field in Fillmore, California. Completed plans call for site work for a playground / park / athletic field.

The work to be done consists of furnishing all materials, equipment, tools, labor, and incidentals as required in the Plans, Specifications and Contract documents for said project for the installation of shade structures at Delores Day Park and Two Rivers Park. The work will take place at Two Rivers Park, River St, Fillmore, CA 93015 and Delores Day Park, 5th St. & Goodenough Rd, Fillmore, CA 93015. Also, any other related work as described in the Specifications and Contract Documents, by reference, made a part hereof. Bid Bond: 10.00% Payment Bond: 100.00% Performance Bond: 100.00% Question Deadline: 01/05/2024 at 5:00 PM PT, Online Q&A: Yes Project Duration: 90 Consecutive Days Start/Delivery Date: March 2024 Response Types: Line Items Type of Award: Lump Sum Right to Reject Proposals a. The City retains the right to reject any and all proposals, to waive any specifications (both the City's and written proposed specifications from proposers) and any informality or irregularity and to sit and act as sole judge of the merit and qualifications of each product/ service offered. Proposer's past performance and the City's assurance that each proposer would provide the materials and labor, equipment, services, and other items as stated on the plans and in the specifications as proposed will be taken into consideration when proposals are being evaluated. b. Proposers agree to honor said proposal for a period of 90 days beyond the final date of submittal to the City. c. Proposals are to be submitted on the forms provided in the attached proposal package. Failure to provide all information required in this Request for Proposal may result in your proposal being rejected as incomplete and non-responsive. All prices, terms, availability and any other conditions shall be complete and in written form.

Award

Playgrounds / Parks / Athletic Fields

$200,401.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
162
Active Projects
96
Bidding Soon
1,794
All Active Projects
802
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 11, 2024

February 12, 2024

img_map_placeholder

Multiple Locations, Fillmore, CA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.