BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a mixed-use development in Modesto, California. Completed plans call for site work for a 8,115-square-foot playground / park / athletic field; and swimming pool.

Removal and replacement of perimeter fencing, concrete mow curbing, turf grass repair, and irrigation repair at the Graceada Park pool facility. Estimated Bid Value Base Bid: $142,800.00, Bid Alternate 1: $11,560.00, Bid Alternate 2: $4,760.00 Project Duration 15 Working Days Liquidated Damages $500.00 per day Email all questions to : Graceada_Park_Pool_Fencing_Replacement_Bid_Questions@docs.e-builder.net All bid questions must be received via the email address listed above by 4:00pm, no later than seven (7) business days prior to the bid opening. The Payment of Prevailing Wages is Required on this Project. Determination of the apparent low bidder will be dependent upon: 1. The lowest Base Bid, plus Bid Alternate #1 and #2, if the total (Base Bid + Bid Alternate #1 + Bid Alternate #2) is below the engineer's Base Bid estimate. 2. The lowest Base Bid, plus Bid Alternate #1, if the total (Base Bid + Bid Alternate #1 + Bid Alternate #2) is above the engineer's Base Bid estimate. No Pre-bid Meeting will be held SCOPE OF WORK, hereinafter called the Work. a. Contractor shall furnish all labor, materials and equipment necessary to complete the Work as specified in the Plans and Specifications entitled The Contractor shall furnish all labor, materials and equipment necessary to complete the work as shown in the Contract Documents. All incidental work not shown in the Contract Documents which is necessary to complete the work necessary to provide the system described, or shown, shall be furnished and installed as part of this contract at no additional cost to the City. B. The Contractor shall inspect the site to observe actual working conditions and restrictions. C. Contractor to remove existing 8' tall fencing, gates, concrete curbing, irrigation, and turf grass as indicated on the construction documentation. D. Contractor to install new 10' tall fencing, gates, concrete curbing, irrigation, and turf grass as indicated on the construction documentation

Award

Swimming Pools

$167,991.00

Public - City

Site Work

7

10

7

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
167
Active Projects
87
Bidding Soon
1,711
All Active Projects
725
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 30, 2024

February 29, 2024

img_map_placeholder

401 Needham St, Modesto, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.