Renovation of a clubhouse / community center in Dundee, Florida. Completed plans call for the renovation of a clubhouse / community center.

As of April 1,2024, project was awarded to JCR Construction and Services, LLC, awarded amount is $96,985.90. Furnish all labor, materials, equipment, and supervision related to and necessary for the Demolition of the existing floor plan for the Community Center as depicted in Exhibit(s) "A - C" attached to the Work Summary and incorporated herein by reference. Furnish all labor, materials, equipment, and supervision related to and necessary for the design and construction of a new floor plan for the Community Center. A. Women/Men restroom area, o Remove 696 LF of tile on the bathroom walls. o Remove and dispose of the existing partitions, toilets, countertops, and sinks. Remove existing mirrors and toilet paper dispensers as well as sanitary napkins dispensers. o Remove existing fluorescent lights in preparation to install LED Lights. B. Lobby and Foyer Area, o Remove and dispose of existing tile and thin set in preparation to install VCT floor. o Self-level the floor in Preparation for installation of new VCT. o Install VCT floor over concrete (NOTE: THIS IS BASED ON A TILE COST OF 1.50 CENTS PER SQ FEET CUSTOMER TO DETERMINE COLOR). o Installation of new 6" Black VCT cover base. C. Main Hall Floor and Stage Area, o Installation of VCT floor over concrete (NOTE: THIS IS BASED ON A TILE COST OF 1.50 CENTS PER SQ FEET CUSTOMER TO DETERMINE COLOR). o Installation of new 6" Black VCT cover base D. Kitchen Area, o Remove and dispose of the quarry tile and thin set. o Installation of VCT floor over concrete (NOTE: THIS IS BASED ON A TILE COST OF 1.50 CENTS PER SQ FEET CUSTOMER TO DETERMINE COLOR). o Installation of new 6" Black VCT cover base. In cases where the bid price exceeds $30,000.00, each bid must be accompanied by a certified check, cashier's check or a bid bond in an amount not less than five per-cent (5%) of the base bid, as guarantee that the Contractor will not withdraw from the competition after the opening of the bids, and will, within twenty-five (25) calendar days after receipt of written notice of award, enter into the Contract with the Town in accordance with the Contract Documents. Should the Contractor fail to enter into a contract, the bid bond shall be forfeited as liquidated damages. All bonds shall be written through a reputable and responsible surety bond agency licensed to do business in the State of Florida and with a surety company or corporation meeting the following specifications. Any aggrieved, actual, or prospective bidder in connection with the RFP may protest to the Town Manager of the Town prior to the award of a contract by the Town Commission of the Town of Dundee. Any bidder intending to not bid on some of the item(s) sought by this solicitation must mark those item(s) as "No Bid." However, if some of the item(s) are being offered at no charge, then items must be marked as "No Charge." Items that are left blank shall be considered a "No Bid" for that item, and the bid shall be evaluated accordingly. Questions may be submitted to the Town Clerk until 3:30 PM on March 13, 2024

Award

Clubhouse / Community Centers

$96,986.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
137
Active Projects
81
Bidding Soon
1,506
All Active Projects
574
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 20, 2024

April 19, 2024

img_map_placeholder

603 Lake Marie Blvd, Dundee, FL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.