BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Danville, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Description of Work. These bids shall cover all the furnishing of all labor, material, equipment, mechanical workmanship, transportation and services which are required for Danville Downtown Master Plan Catalyst Project, Contract No. A-362. The work generally includes, but is not limited to, demolition of existing roadway improvements including sidewalk, drainage, and roadway excavation, construction of curb, gutter, sidewalk, and curb ramps, paving, drainage improvements including inlets, manholes, storm drain pipe, and valley gutter, signing and striping, street lighting, RRFB modifications, landscaping, hardscape amenities, traffic control, and other items that are required by the plans, standard specifications, or these Special Provisions. Engineer's Estimate. The estimated cost of construction is approximately $4,300,000. Questions. Direct any questions to: Andrew Dillard Transportation Manager Town of Danville | 500 La Gonda Way | Danville, CA 94526 (925) 314-3384 | f (925) 838-0797 adillard@danville.ca.gov To be included on the official Plan Holder's List, bidders must send your name, company name, address, and phone numbers and email address to engineering@danville.ca.gov. The Plan Holder's List will be made available upon written request Prevailing Wage Rates. This Project is subject to the prevailing wage requirements applicable in Contra Costa County for each craft, classification or type of worker needed to perform the work, including employer payments for health and welfare, pension, vacation, apprenticeship and similar purposes. These prevailing wage rates are available online. Each Contractor and Subcontractor must pay no less than the specified rates to all workers employed to work on the Project. The schedule of per diem wages is based upon a working day of eight (8) hours. The rate for holiday and overtime work must be at least time and one-half. The Contract will be subject to compliance monitoring and enforcement by the California Department of Industrial Relations, pursuant to Labor Code Section 1771.4.

Award

Roads / Highways

$4,106,641.00

Public - City

Paving, Site Work

210

42

4

3

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
138
Active Projects
54
Bidding Soon
1,867
All Active Projects
794
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 13, 2024

April 15, 2024

img_map_placeholder

Multiple Locations, Danville, CA

Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.